ILLINOIS POLLUTION CONTROL BOARD
    June
    26,
    1975
    SKYWAY
    REALTY,
    Petitioner,
    V.
    )
    PCB 75—249
    ENVIRONMENTAL PROTECTION AGENCY,
    Respondent.
    ORDER
    OF THE BOARD (by Mr. Dumelle):
    Petition filed June 23, 1975 is inadequate in that the
    strength
    of the effluent from the Lansing sewage treatment plant
    is
    not given nor is a statement of the biological condition of the
    :recei9ing
    streams
    r211e
    Petition is not clear as to whether the
    sewer
    connection
    ban
    imposed by
    the
    Illinois Environmental Protec-
    tion
    Agency is as a result of inadequate sewage treatment or
    inad~uate hydraulic transport capacity~. Furthermore, the date
    the proposed connection of the Lansing sewer system to the
    detropolitan
    Sanitary District of Greater Chicago is not given.
    Petitioner shall amend the Petition within 21 days of the
    date of this Order to provide the needed information outlined above.
    iaiiure to timely file an Amended Petition shall render the Petition
    liable to dismissal for inadequacy~ The 90-day decision period set
    by statute shall run from the date of filing the Amended Petition.
    A~waiver of the decision date to conform to this schedule shall be
    filed with the Amended Petition~
    IT IS SO
    ORDERED~
    I,
    Christan L. Moffett, Clerk of the Illinois Pollution Control
    Board, hereby certify the abov~Order was adopted on the
    ~
    day
    of June, 1975 by a vote of
    Lj...~
    Illinois Pollution
    17 —451

    Back to top