ILLINOIS POLLUTION CONTROL BOARD
May 15, 1975
CONTINENTAL CAN COMPANY, INC.,
Metals Division,
Petitioner,
v.
)
PCB 75—200
ENVIRONMENTAL PROTECTION AGENCY,
Respondent.
INTERIM OPINION AND ORDER OF THE BOARD (by Mr. Goodman):
This matter comes before the Pollution Control Board
(Board) upon Continental Can Company~s (Can) May 13, 1975
petition for a variance from Rule 205(F) of the Air Pol-
lution Control Regulations.
It is the Board~sopinion that the petition is inade-
quate. Petitioner fails to state the permit requirements
from which it seeks a variance. In addition, Petitioner has
no information pertaining to the criteria required by
Train v. NRDC, Inc., 43 USLW 4467 (Supreme Court No. 73-1742
April 16, 1975). Petitioner must show: 1) Whether the
ambient air quality of the area affected by the variance
meets the national ambient air quality standards as adopted
by the Board; 2) If the ambient air quality does not meet
those standards, whether the granting of the variance would
contribute to the are&s failure to meet said standards; and
3) If the ambient air quality does meet said standards,
whether the variance would cause the ambient air quality to
fail to meet said standards.
It is the order of the Board that Petitioner shall
amend itspetition within 45 days of this Order to provide
the above described information. Failure to timely file the
amended petition shall cause the petition to be dismissed
for inadequacy without prejudice. The 90-day decision
period set by Statute shall run from the date of filing the
amended petition.
IT IS SO ORDERED.
I, Christan L. Moffett, Clerk of the Illinois Pollution
Control Board, hereby certify hat the above Opinion and
Order were adopted ~n the
/ ~
day offfl~~
1975 by a vote of
‘-~
.
C
~
Illinois Pollution C ol Board
17
—61