ILLINOIS POLLUTION CONTROL BOARD
    May 15, 1975
    ALLIED CHEMICAL CORPORATION,
    Petitioner,
    v.
    )
    PCB 75—ill
    ENVIRONMENTAL PROTECTION AGENCY,
    Respondent.
    INTERIM OPINION AND ORDER OF THE
    BOARD
    (by Mr. Goodman):
    This matter comes before the Pollution Control Board
    (Board) upon Allied Chemical Corporation’s (Allied) petition
    for an interim variance from Rules 404(f), 408(a), 203(a)
    and
    203(f)
    for water quality standards and a variance from
    Rule 921 of Chapter 3 and Rule 201 of Chapter 4 of the
    Regulations for its mining and milling operations at 7
    locations in Hardin and Pope counties.
    The record sets forth adequate grounds for a hardship
    variance as provided in procedural Rule 401. Allied is one
    of two florspar producers in the area which together produce
    80 of the domestic florspar in the United States. Allied’s
    mining and milling operations represent a substantial or
    major part of the non—governmental and non—agricultural
    employment in the area.
    However, Allied’s petition does not contain a com-
    pliance plan although it has retained Procon, Incorporated,
    to perform an engineering study which will then be reviewed
    by Allied’s engineers and go before Allied Board of Direc-
    tors for approval. Petitioner believes that said plan will
    be available for its Board of Directors by July 1, 1975 and
    that a final compliance plan will be available by September 1,
    1975,
    In order to avoid a multiplicity of actions, the Board
    will not grant Petitioner a variance at this time. The
    Board requests that Petitioner provide the EPA with a copy
    of its tentative compliance plan on July 1, 1975. In addi-
    tion, the Board requests that a final corporate approved
    compliance plan be submitted to the Board on or before
    September 1, 1975. If said compliance plan meets the ap-
    proval of the Board, a retroactive variance may be granted
    to the Petitioner.
    In consideration of the foregoing, it is the order of
    the Board that:
    17 —43

    —2—
    (a) Petitioner provide the Environmental Protection
    Agency with a tentative compliance plan on or before July 1,
    1975; and
    (b) Petitioner shall submit to the Board a final,
    corporate approved, compliance plan on or before September 1,
    1975; and
    (c) Failure to comply with paragraph (b) of this order
    will cause Allied’s petition to be dismissed without prejudice.
    IT IS SO
    ORDERED.
    I, Christan L. Moffett, Clerk of the Illinois Pollution
    Control Board, hereby ce!rtify the above Opinion and Order
    were adopted on the ___________day of
    1Y)
    1975 by a vote of __________________________
    Illinois Pollution
    Board
    17—44