ILLINOIS POLLUTION CONTROL BOARD
    November 26, 1975
    VILLAGE OF STEWARDSON
    V.
    Petitioner,
    ENVIRONMENTAL PROTECTION AGENCY,
    Respondent.
    )
    )
    )
    )
    )
    )
    )
    )
    )
    )
    )
    PCB 75—445
    ORDER OF THE BOARD (by Mr. Dumelle):
    Petition filed November 14, 1975 is inadequate in that no
    time schedule for Phase II construction is given nor is the
    existence, if any, of algae blooms or problems upon Carlyle
    Reservoir documented. The Federal document referred to in
    the Petition should be supplied to the Board.
    Petitioner shall amend the Petition within 45 days from
    the date of this Order to supply the requested information.
    Failure to timely file the Amended Petition shall make this
    cause liable to dismissal for inadequacy. The 90—day decisipn
    period set by statute shall run from the date of filing the
    Amended Petition.
    IT IS SO ORDERED.
    I, Christan L. Moffett, Clerk of the Illinois Pollution Control
    Board, hereby certify the above Order was adopted on the
    ~
    day
    of November, 1975 by a vote of r/-~
    Illinois Pollution
    19—345

    Back to top