ILLINOIS POLLUTION CONTROL BOARD
February 11, 1976
LEONARD C. TRIEN, d/b/a TRIEM
)
INDUSTRIAL BUILDING OPERATIONS,
)
)
Petitioner,
)
v.
)
PCB 76-32
ENVIRONMENTAL PROTECTION AGENCY,
)
Respondent.
INTERIM ORDER OF THE BOARD (by Mr. Zeitlin):
The Petition for Variance filed February 5, 1976 in this matter
is inadequate, for the following reasons:
1. Petitioner fails, in seeking a Variance from
the permit requirement
in
Rule 202(b) of Chapter 7: Solid
Waste, to detail any reasons why it is unable to obtain
the necessary permit(s) from the Environmental Protection
Agency.
2. Petitioner fails to show which, if any, of the
substantive Regulations in Chapter 7: Solid Waste, would
prevent the issuance of such permit(s).
3. Petitioner fails to show why similar relief
could not be obtained through Variance from applicable
substantive Regulations, in compliance with the Board’s
announced policy of preference toward the grant of such
Variance from substantive Regulations, where such grant
allows the Environmental Protection Agency to grant the
applicable permit(s).
In addition to the above, Petitioner is referred to the specific
requirements of Board Procedural Rule 401.
It is the Order of the Board that Petitioner shall amend its
Petition within 45 days of the date of this Order to provide the above
described information. Failure to timely file the Amended Petition
shall render this cause liable to dismissal for inadequacy. The 90—day
decision period set by statute shall run from the date of filing of the
Amended Petition.
IT IS SO ORDERED.
I, Christan L. Moffett, Clerk of the Illinois Pollution
Control Bo~rd,hereb c rtify the above Interim Order was adopted
on the
LI~
day of
__________,
1976, by a vote of
4.~,
Christan L. o fet lerk
Illinois Pollution trol Board
20—77