ILLINOIS POLLUTION CONTROL
BOARD
February
11, 1976
E.
.1.
DU PONT DE NEMOURS AND
)
COMPANY,
Petitioner,
v.
)
PCB 76-30
ENVIRONMENTAL PROTECTION AGENCY,
Respondent.
ORDER
OF
TIlE BOARD
(By Dr. Satchell):
Petition filed February
2, 1976 is inadequate in that:
(1)
no assurance is given that by granting instant petition
violation of other regulations and/or rules would not
ensue to the detriment of the environment; specifically,
Rules
203(f),
402,
and 401(c)
of Chapter
3: Water Pollution
of the Pollution Control Board.
(2) pursuant to the Procedural Rules of the Board, statements
covering a time schedule
Rule
401(vii),(viii)
for com-
pliance are required.
While the arguments for use of ion exchange methods for
pollution abatement and non-use of the regenerating solution
may be reasonable,
it is not clear why the method
of regenera-
ti.on used in fertilizer manufacture is also proposed here.
Petitioner shall amend the Petition within 45 days from the
date of this Order to supply the requested information.
Failure to
timely file the Amended Petition shall make this cause liable
to dismissal for inadequacy.
The 90—day decision period set
by statute shall run from the date of filing the Amended Petition.
IT IS SO ORDERED.
I, Christan L. Moffett, Clerk of the Illinois Pollution Control
Board, hereby certify the above Order was adopted on the //~“ day
of February, 1976 by a vote of
4/..e~
Illinois Pollution
ontrol Board
20—75