ILLINOIS POLLUTION CONTROL BOARD
    February
    3,
    1977
    SCHOOL DISTRICT
    #102
    Petitioner,
    v.
    )
    PCB 76—307
    ENVIRONMENTAL
    PROTECTION AGENCY,
    Respondent.
    OPINION OF THE BOARD
    (by Mr. Dumelle)
    On January
    6,
    1977
    the Board granted Petitioner a variance
    from Water Pollution Regulation 962 permitting
    the connection of
    the proposed middle school onto the Marquette Heights sewer
    system.
    The Board’s Opinion,
    in this matter, which was not
    issued at
    the time of
    the January
    6,
    1977 Order, appears below.
    This matter came before the Board on a Petition for Variance
    filed
    on November 30,
    1976 by School District No.
    102, Tazewell
    County.
    The Agency filed its Recommendation on December 30,
    1976,
    recommending the granting of this variance
    to allow the connection
    of
    the
    proposed middle school onto the Marquette Heights sewer
    system.
    The Recommendation included inspection and sampling data
    regarding
    the Marquette Heights plant
    (Plant)
    ,
    which had previously
    caused
    the
    Agency to deny Petitioner’s application for an
    Agency construction permit due to the violations occurring at
    that Plant.
    Construction of the new school, with a maximum enrollment
    of
    600
    st-iideflts,
    is
    fl(~CC’SSary,
    r~f
    1c~iut
    in
    p~irt
    ,
    1~’iii~u~
    Hu’
    1~H
    (
    ;‘t()wn
    iii~j~t
    III(~I~~~~()I
    h~n;
    I)((n
    l~It~(t
    to
    1~(
    I
    iuid&’juat
    (
    ~1!1d
    uiiuu
    i
    I able I~t~
    put.)
    I
    IC
    SChOOl
    ~)UrpOSes
    I
    1)dS—
    much as
    the
    existing school will be abandoned upon completion
    of the new middle school, and both schools would be connected
    onto the same Plant, the new school would account for the
    addition of an estimated population equivalent of
    57
    to the
    Plant’s loading.
    The Agency places the increased loading
    at
    46 P.E.
    The actual increase
    in pollution caused by con-
    struction of the new school will be negligible.
    For this reason,
    coupled with the extreme social value and necessity
    for the
    new middle school,
    the Board finds that a denial of the requested
    variance would place an arbitrary or unreasonable hardship upon
    Petitioner.
    24
    715

    The Agency’s recommendation points out that the Marquette
    Iieiuhts sewage treatment plant has not maintained or operated
    1except for one day)
    the secondary portion of the plant.
    The
    reaEon for this
    is not given and the Board, by this decision,
    s
    not
    any
    w~ly
    condone
    this
    ~.
    i
    in c
    to operate
    the
    entire
    sewage
    I
    by
    the
    Hi
    ty
    of
    Marquette
    IPi qhts.
    This
    Opinion constitutes
    the Board’s findings of fact
    and conclusions of
    law.
    I,
    Christan
    L.
    Moffett,
    Clerk
    of
    the
    Illinois
    Pollution
    Co~trol
    Board,
    hereby
    certify
    the
    above
    Opi
    ion
    was
    adopted
    on
    the
    ~
    day
    of
    February,
    1977
    by
    a
    vote
    of
    -~
    ______________
    Illinois Pollution
    ntrol
    Board
    24
    716

    Back to top