ILLINOIS POLLUTION CONTROL BOARD
    February 3, 1977
    HYON WASTE MANAGEMENT SERVICES, INC.,
    Petitioner,
    V.
    )
    PCB 76—166
    ENVIRONMENTAL PROTECTION AGENCY,
    )
    Respondent.
    ORDER OF THE BOARD (by Mr. Zeitlin):
    The Board’s Principal Opinion and Order in this matter was
    entered on December 16, 1976. On January 24, 1977, Petitioner Hyon
    filed a Motion for Clarification with regard to one of the Board’s
    findings in the case; specifically, that the Board determine precisely
    the period for which it is entitled to a permit.
    Our finding in this matter that the period for which Hyon was
    issued a permit was unreasonable as a condition on the permit does
    not imply that any other period of issuance has been determined to
    be proper. The permit was remanded to the Agency for consideration
    in light of our Opinion and Order, which consideration should include
    determination of the appropriate period of duration for the permit.
    Our Opinion and Order clearly so stated, (p. 9).
    Hyon’s Motion for Clarification is denied.
    IT IS So ORDERED.
    Mr. James Young abstained.
    I, Christan L, Moffett, Clerk of the Illinois Pollution
    Control Board, hei~ebycertify the above Order was ad9pted on
    the ~
    day of
    ~7-.J-.1
    ,
    1977, by a vote of
    ~
    U
    Christan L. Moffett, Clerk