ILLINOIS POLLUTION CONTROL BOARD
    January 23, 2003
     
    SATHER ENTERPRISES, LTD.,
     
    Petitioner,
     
    v.
     
    ILLINOIS ENVIRONMENTAL
    PROTECTION AGENCY,
     
    Respondent.
    )
    )
    )
    )
    )
    )
    )
    )
    )
    )
     
     
     
     
     
    PCB 03-99
    (UST Fund)
    (90-Day Extension)
     
    ORDER OF THE BOARD (by T. E. Johnson):
     
    On January 8, 2003, Sather Enterprises, Ltd. (Sather) and the Illinois Environmental
    Protection Agency (Agency) sent by certified mail a joint request to extend the 35-day period for
    petitioning a December 4, 2002 Agency determination. The Board received the petition on
    January 10, 2003. Because the postmark date precedes the filing deadline date, the petition is
    deemed timely filed on the postmark date. 35 Ill. Adm. Code 101.300(b)(2). The Agency
    determination modified the amended Site Classification Work Plan Budget regarding Sather’s
    leaking underground storage tank site at Route 54 and Route 150 in Dewitt County. The Board
    extends the appeal period until April 10, 2003, as the parties request.
    See
    415 ILCS 5/40(a)(1)
    (2002); 35 Ill. Adm. Code 105.208(a). If Sather fails to file an appeal on or before that date, the
    Board will dismiss this case and close the docket.
     
    IT IS SO ORDERED.
     
    I, Dorothy M. Gunn, Clerk of the Illinois Pollution Control Board, certify that the Board
    adopted the above order on January 23, 2003, by a vote of 6-0.
     
    Dorothy M. Gunn, Clerk
    Illinois Pollution Control Board
     

    Back to top