ILLINOIS POLLUTION CONTROL BOARD
    April
    8,
    1976
    LINDBERG
    CORPORATION,
    Petitioner,
    v.
    )
    PCB
    76—91
    ENVIRONMENTAL
    PROTECTION
    AGENCY,
    Respondent.
    INTERIM ORDER OF THE BOARD
    (by Mr.
    Goodman):
    This matter comes before the Pollution Control Board
    (Board)
    upon the April
    2,
    1976,
    Petition of Lindberg Corporation
    (Lindberg)
    for variance from the particulate regulations
    for its Meirose Park
    salt heating operation.
    The Board finds the petition to be inade-
    quate
    in that Petitioner
    fails
    to state:
    1) the specific regula-
    tions from which variance
    is sought;
    2)
    an estimate of the quantity
    of contaminants discharged;
    3)
    whether the ambient air quality of
    the area affected by the variance meets the national ambient air
    quality standards;
    4)
    if the ambient air quality does not meet
    those standards, whether the granting of the variance would contri-
    bute to the area~s failure to meet said standards;
    and
    5)
    if the
    ambient air quality does meet said standards, whether the variance
    would cause the ambient air quality to fail to meet said standards.
    It is the Order of the Board that Petitioner shall amend its
    petition within
    45 days of this Order to provide the above described
    information.
    Failure to timely file the amended petition shall cause
    the petition to be dismissed for inadequacy without prujudice.
    The
    90—day decision period set by Statute shall run from the date of
    filing the amended petition.
    IT IS SO ORDERED.
    21
    149

    —2—
    I, Christan L. Moffett,
    Clerk of the Illinois Pollution Control
    Boar~ hereby certif
    the above Interim Order was adopted on the
    ________day of~~_,
    1976 by a vote of
    ~
    ~
    Christan
    L. Moffet
    ,
    rk
    Illinois Pollution
    rol Board

    Back to top