ILLINOIS POLLUTION CONTROL BOARD
    November 10, 1976
    FARMINGTON DEVELOPMENT CORP.,
    INC.
    AND FARMINGTON MANOR, INC.
    Petitioner,
    v.
    )
    PCB 76—284
    ENVIRONMENTAL PROTECTION N’ENCY,
    )
    Respondent.
    ORDER OF THE BOARD (by Mr. Dumelle):
    Petition filed November 9, 1976 is inadequate in that the
    effects of the proposed Nursing and Care Center discharge upon
    the sewage treatment plant and that in turn upon the receiving
    stream are not given. The present, condition of the receivinq
    stream as to dissolved oxygen levels, sludge deposits, alcial
    qrowth, etc. isnot given.
    Petitioner shall amend the Petition within 45 days of the date
    of this Order to provide the necessary information. A waiver of the
    90-day decision period set by statute shall also be filed with the
    Board and Agency to commence with the filing of the Amended Petition.
    Failure to timely file the Amended Petition shall render the Petition
    liable to dismissal for inadequacy.
    IT IS SO ORDERED.
    I, Christan L. Moffett, Clerk of the Illinois Pollution Control
    Board, hereby certify the above Order was adopted
    on
    the
    ~
    day
    of November, 1976 by a vote of
    ______
    Qstani~.Moe~
    Illinois Pollution Co ol Hoard
    24
    289

    Back to top