ILLINOIS POLLUTION CONTROL BOARD
    September 30, 1976
    VILLAGE OF ADDISON
    )
    )
    Petitioner,
    v.
    )
    PCB 76—119
    ENVIRONMENTAL PROTECTION AGENCY,
    Respondent.
    OPINION AND ORDER OF THE BOARD (by Mr. Dumelle):
    Petition for variance from Rule 602 of Chapter 3, Water
    Pollution Rules and Regulations, was filed with the Board on
    April 27, 1976. The Environmental Protection Agency (“Agency”)
    filed its Recommendation on July 21, 1976. No public hearing
    ~as held. Additional material was filed by the Petitioner on
    August 23, 1976. An Agency reply to the Petitioner’s material
    was filed today.
    The Village of Addison (“Addison”) asks to construct a
    110,000 gpm (245 cfs) pumping station at Diversey Avenue dis-
    charging combined stormwater from its sewer system into Salt
    Creek which is tributary to Des Plaines River. The proposed
    pumping station will provide drainage relief for 200 acres of
    the Village served by combined sewers. Flooding of streets
    and homes in 22 acres of this 200 acre area occurs affectinq
    65 homes about 10 times a year (Pet. p. 1).
    The Diversey Avenue Pumping Station is to augT~kentthe
    existing Myrick Avenue Pumping Station which has a capacity of
    21,000 gpm or 19 that of the proposed station. Diversey
    Avenue will also handle storm flows from a 500 acre area which
    has separate storm and sanitary sewers. This area also floods
    and 105 single family homes and an apartment area of 60 units
    are affected.
    Addison asserts that compliance with Rule 602 will come
    by May 1979. It received a Step 2 Grant on March 2, 1976 for
    work on its South Sewage Treatment Plant and Intercepting Sewers.
    The South Treatment Plant will provide complete treatment for
    23
    635

    —2—
    2.5 times dry-weather—flow and primary treatment for 10 times
    dry-weather—flow.
    The Petitioner asserts that because of inadequate pumping
    capacity at Myrick Avenue the time of overflow to Salt Creek
    extends well beyond the actual rain periods. In the period
    from May 1974 to April 1975, precipitation occurred on 79 days
    but Myrick Avenue pumped on 152 days. Gravity bypasses to
    Salt Creek also occurred when the Creek level is below 661 ft.
    elevation above sea level but no records are available for these
    occurrences.
    Using the same data it is estimated that the periods of
    pumping would be reduced to 52 days from the present 152 days.
    Thus the same total volume will be pumped to Salt Creek but in
    a shorter time. And since presumably the Creek is at maximum
    flow during and immediately after a rain, the effects upon its
    dissolved oxygen levels should be no worse than now (7.6 mg/l).
    The hardship that will be suffered by Addison if the variance
    is not granted is the inability to relieve surface flooding to
    the enumerated properties.
    The Agency initially recommended denial of the variance
    because it believed that the inclusion of storm sewers will make
    it grant ineligible. Also the Agency found that the “cost-
    effective survey” submitted by Addison was not sufficient to
    check the sizings of the interceptor sewers to the sewage plant.
    Thus it could not determine if Addison’s proposed compliance
    plan is adequate.
    The letter of August 19, 1976 from the Village President of
    Addison points out that the Diversey Avenue Pumping Station is
    not intended to be part of the grant—financed sewage work improve-
    ments. Funds are on hand for this purpose which were raised from
    a local bond issue. The question of interceptor sizinq to the
    plant is also reviewed in the same letter to their consulting
    enqineer.
    The Agency’s September 30 submission found that the Diversey
    Avenue Pumping Station does comport with planning principles for
    the portion of the area it will serve. A grant of the variance is
    recommended.
    The variance thus is a request to build a supplementary
    combined stormwater pumping station with local funds. The period
    23
    636

    —3—
    of pumping will be reduced by two-thirds and thus less retention
    in the sewers should occur. Consequently the sanitary wastes portion
    discharged should decrease.
    We feel the variance should be granted. Some of the flooding
    described is due to overbank inundation and may be reduced by the
    proposed levee. How much flooding will then remain to be cured by
    this variance is not clear. But the environmental effects of the
    present sanitary discharges should be reduced.
    On September 9, 1976 a petition was filed from three residents
    affected by the flooding requesting a public hearing. Without
    ruling on the validity of the hearing request we would note that it
    is moot because of the grant of the variance.
    This Opinion constitutes the Board’s findings of fact and
    conclusions of law.
    ORDER
    Petition for variance from Rules 602(a), 602(c) and 602(d) (3)
    in order to allow the construction of the Diversey Avenue Pumping
    Station is granted. Petitioner shall apply for and obtain all
    necessary construction permits.
    IT IS SO ORDERED.
    T, Christan T.. Moffett, Clerk of
    the Tilinois Pollution
    Control
    Boarq~hereby certify the above Opinion and Ord r were adopted on the
    ~day
    of September, 1976 by a vote of
    .‘~
    Illinois Pollution C
    Board
    23