ILLINOIS POLLUTION CONTROL BOARD
September 15, 1976
ELMHURST NATIONAL BANK,
as Trustee
tJ/T 3766,
ANNORENO and IRNEN
BUILDERS,
INC.,
Petitioners,
v.
)
PCB 76—214
ENVIRONMENTAL PROTECTION AGENCY,
Respondent.
ORDER OF THE BOARD
(by Mr. Goodman):
On August
26, 1976,
Petitioners
filed a Petition for Variance.
The Board finds the Petition inadequate and finds the following in-
formation to be lacking:
1.
a copy of Pemit No. 196H580 issued by the Sanitary
Water Board;
2.
a statement of the precise section of the Act or
Regulations from which variance
is sought including a
statement as to how such variance would provide Petitioners
the
r(’1
i(~f
they
~r’
~‘~k
I
3.
a statement as to whether variance
is sought for both
the completed 36-flat building and the proposed construction;
23
—
531
—2—
4.
if variance
is sought for the proposed construction,
a
statement as
to when construction will be completed and a
statement
as
to the hardship Petitioners will suffer if said
variance
is denied.
Petitioner
shall amend its Petition within
35 days of the date
of this Order
to provide the requested information.
The 90-day period
set by statute
shall commence with the filing of the Amended Petition.
Failure
to timely file said Amended Petition shall subject this
Petition to dismissal for inadequacy.
IT IS SO ORDERED.
I,
Christan
L.
Moffett,
Clerk of the Illinois Pollution gontrol
Board, hereby certify the above Order was adopted on the
/4’~”~
day of~~L~
,
1976 by
a vote of
~
Christan
L. Moffet~
erk
Illinois Pollution
ontrol Board