ILLINOIS POLLUTION CONTROL BOARD
    January 23, 1997
    DEKALB SANITARY DISTRICT,
    Petitioner,
    v.
    ILLINOIS ENVIRONMENTAL
    PROTECTION AGENCY,
    Respondent.
    )
    )
    )
    )
    )
    )
    )
    )
    )
    )
    PCB 97-78
    (Variance - NPDES)
    OPINION AND ORDER OF THE BOARD (by J. Yi):
    On October 30 1996 the DeKalb Sanitary District (District) filed a request for variance
    from the Board's regulations at 35 Ill. Adm. Code 304.141 and 304.120(c), as they apply to
    the District's effluent discharges of carbonaceous biochemical oxygen demand (CBOD
    5
    ) and
    total suspended solids (TSS).
    1
    The District requests the variance for a period of four months
    to complete construction of its tertiary facility.
    On December 2, 1996 the Illinois Environmental Protection Agency (Agency) filed its
    recommendation, recommending that the variance be granted with certain conditions.
    2
    The
    District did not file a response to the Agency’s recommendation. The District waived hearing
    in its petition, and no hearing was held.
    The Board's responsibility in this matter arises from the Environmental Protection Act
    (Act) (415 ILCS 5/1
    et seq.
    (1994).) The Board is charged in the Act with the responsibility
    of granting variance from Board regulations whenever it is found that compliance with the
    regulations would impose an arbitrary or unreasonable hardship upon the petitioner. (415
    ILCS 5/35(a).) The Agency is required to appear in hearings on variance petitions. (415
    ILCS 5/4(f).) The Agency is also charged, among other matters, with the responsibility of
    investigating each variance petition and making a recommendation to the Board as to the
    disposition of the petition. (415 ILCS 5/37(a).)
    BACKGROUND
    The District states that it has received two provisional variances to perform
    rehabilitation and corrosion control on the sand filter units, and past experience has indicated
    that it can achieve CBOD
    5
    monthly averages of 15 mg/1 with a daily maximum of 30 mg/1
    1
    The petition filed by the District will be referenced to as “Pet. at ” and petitioners exhibits
    will be referenced to as “Exh. at .”
    2
    The Agency’s recommendation will be referred to as “Rec. at .”

    2
    and TSS monthly averages of 30 mg/1 with a daily maximum of 50 mg/1.
    3
    (Pet. at 1.) The
    District is requesting the variance so that it may exceed its National Pollution Discharge
    Elimination System (NPDES) permit discharge limits for TSS and CBOD
    5
    for its main
    wastewater treatment plant for a period of four months during tertiary facility rehabilitation
    scheduled concurrent with ongoing plant expansion. (Pet. at 1.) The Agency states that the
    District is "requesting a variance from the Illinois PCB’s regulations requiring discharges of
    five-day carbonaceous biochemical oxygen demand (CBOD5) and total suspended solids (TSS)
    not to exceed 10 and 12 milligrams per liter monthly average, respectively, as found at 35 Ill.
    Adm. Code 304.120(c)." (Rec. at 1.) The Agency also states that the District is seeking relief
    from 35 Ill. Adm. Code 304.141(a) NPDES Effluent Standards. (Rec. at 1.) The Agency
    further asserts that the requested variance would specifically provide relief from the
    requirements of 35 Ill. Adm. Code 304.120(c) and 304.141(a). (Rec. at 1.)
    The District's main plant serves a Facilities Planning Area which includes the City of
    DeKalb, the Town of Cortland, and adjacent commercial and industrial areas. (Pet. at 2.)
    The District claims that the limits of the Facilities Planning Area are as indicated in the
    Facility Plan on file with the Agency (EPA No. C171334). (Pet. at 2.) The District asserts
    that the population served is approximately 40,000 persons. The District employs 15 persons
    at its facility. (Pet. at 2.)
    The District’s main wastewater treatment plant currently discharges approximately 5.99
    MGD (average daily flow) of treated plant effluent. (Pet. at 2.) The District's plant
    discharges directly to the South Branch of the Kishwaukee River at designated 001 STP
    outfall. (Pet. at 2.) Currently, there is a major expansion project underway which will
    increase plant capacity due to need caused by substantial development in this area. (Pet. at 2.)
    The District states that the rehabilitation of the tertiary filter building includes removal of all
    eight cell appurtenances, structural repairs, replacement of cell filtration elements,
    miscellaneous valve repairs and replacements, a new control system, preservation, and media
    replacement, and will cost $386,192. (Pet. at 2.) The Agency asserts that the District is
    presently involved in a 8.85 million dollar improvement and expansion project for its facility.
    (Rec. at 2.) The Agency claims that only a portion of this project involves a comprehensive
    overhaul of the eight tertiary filter cells at the facility to repair damage caused by wear and
    corrosion. (Rec. at 2.) The Agency states that "[t]his work will include removal of the
    existing filter media, hold down beams, perimeter anchors, the entire underdrain system, the
    backwash trough V-notch weirs, the splash plates and the underdrain support channels." (Rec.
    at 2.)
    The District states that the tertiary facility at issue is composed of eight individual sand
    filtration cells housed in one building with supporting pumps, compressors, and electrical
    control components. (Pet. at 2.) The District asserts that each of the filtration cells is
    fabricated from steel, with I-beam underdrain support rails and that ten inches of sand is
    located above the stainless steel screens that are supported by the above underdrain rail system.
    3
    The District's prior provisional variances were granted in PCB 93-127, July, 1, 1993 and
    PCB 96-104, November 16, 1995.

    3
    (Pet. at 2.) The District states that the wastewater is filtered through the above described
    filtration system removing CBOD
    5
    and TSS prior to disinfection and discharge to the receiving
    stream. (Pet. at 2.) The District claims that frequently the underdrain support system fails
    and treatment unit corrosion, among other issues associated with the operation of the facility,
    must be corrected to assure future process reliability and compliance with the NPDES limits as
    defined in the District's NPDES permit. (Pet. at 2.) The District states that its eight cell sand
    filter process was designed to meet the 10 CBOD
    5
    /12 TSS daily limits with seven cells in
    operation and one backwash condition. (Pet. at 2.) However, the District maintains as the
    cells fail and no longer function, the system begins to have fewer units “on-line" to meet
    requirements and the viable units become overloaded and thus fail more frequently. (Pet. at
    2.)
    The District claims that excessive man hours, downtime and expenses have been the
    result of structural problems and that the advanced stage of deterioration and high maintenance
    requirements dictated that a major renovation be prudent to enable it to continue to meet
    discharge limits well into 21st century. (Pet. at 2.) The District states that by undertaking the
    renovation concurrently with the ongoing plant expansion it will ensure greater reliability of its
    tertiary treatment component for the next twenty plus years. (Pet. at 2.) The District asserts
    that the replacement components will remain basically the same as those existing, however, the
    equipment currently is in an advanced state of deterioration and will be replaced with state-of-
    the-art components. (Pet. at 3.) The District claims that the structural rehabilitation will
    provide the cell components with an extended life-expectancy through better design of
    supporting structures and replacement of existing decayed infrastructure. (Pet. at 3.)
    The Agency states that it agrees with the facts described in the District's petition and
    believes, after viewing all the facts, that the only means to perform the necessary refurbishing
    work described above is to remove the tertiary filters from service. (Rec. at 3.) Furthermore,
    the Agency agrees with the District's statement that the only means of compliance is to employ
    an alternate tertiary treatment system during the four month period, and that no such
    alternative system is presently available to the District. (Rec. at 3-4.)
    REGULATORY FRAMEWORK
    The District is requesting a variance from the Board's water regulations set forth at 35
    Ill. Adm. Code 304.141, NPDES Effluent Standards, and 35 Ill. Adm. Code 304.120,
    Deoxygenating Wastes. The pertinent language of those sections are as follows:
    Section 304.141 NPDES Effluent Standards
    a) No person to whom an NPDES Permit has been issued may discharge any
    contaminant in his effluent in excess of the standards and limitations for that
    contaminant which are set forth in his permit.
    Section 304.120 Deoxygenating Wastes

    4
    c) No effluent whose dilution ratio is less than five to one shall exceed 10 mg/1
    of BOD
    5
    or 12 mg/1 of suspended solids, except that sources employing
    third-stage treatment lagoons shall be exempt from this subsection provided
    all of the following conditions are met:
    1) The waste source qualifies under one of the following categories:
    A) Any wastewater treatment works with an untreated waste load
    less than 2500 population equivalents which is sufficiently
    isolated that combining with other sources to aggregate 2500
    population equivalents or more is not practicable.
    B) Any wastewater treatment works in existence and employing
    third stage treatment lagoons on January 1, 1986 whose
    untreated waste load is 5000 population equivalents or less and
    sufficiently isolated that combining to aggregate 5000
    population equivalents or more is not practicable.
    C) Any wastewater treatment works with an untreated waste load
    of 5000 population equivalents or less, which has reached the
    end of its useful life by January 1, 1987, and is sufficiently
    isolated that combining to aggregate 5000 population
    equivalents or more is not practicable.
    D) Any wastewater treatment works with an untreated waste load
    of 5000 population equivalents or less which has reached the
    end of its useful life and which has received an adjusted
    standard determination from the Board that it qualifies for a
    lagoon exemption. Such a Board determination will only be
    made in an adjusted standard proceeding, held in accordance
    with Section 28.1 of the Environmental Protection Act (Ill.
    Rev. Stat. 1987, ch. 111 ½, par. 1028.1) and applicable
    procedures set forth by 35 Ill. Adm. Code 106.
    i) In an adjusted standard proceeding the Board may
    determine that the petitioning wastewater treatment
    source qualifies for a lagoon exemption if the
    wastewater treatment works proves that it is so situated
    that a land treatment system is not a suitable treatment
    alternative. Factors relevant to a suitability finding
    may include the following: cost; influent character;
    geographic characteristics; climate; soil conditions;
    hydrologic conditions; and the availability of irrigable
    land.

    5
    ii) For the purposes of this subsection (D), a land
    treatment system is a wastewater treatment system
    which does not directly discharge treated effluent to
    waters of the State but instead uses the treated effluent
    to irrigate terrestrial vegetation.
    In determining whether any variance is to be granted, the Act requires the Board to
    determine whether a petitioner has presented adequate proof that immediate compliance with
    the Board regulations at issue would impose an arbitrary or unreasonable hardship. (415 ILCS
    5/35(a)(1994).) Further, the burden is on the petitioner to show that its claimed hardship
    outweighs the public interest in attaining compliance with regulations designed to protect the
    public. (Willowbrook Motel v. Pollution Control Board, 135 Ill. App.3d 343, 481 N.E.2d
    1032 (1985).) Only with such a showing can the claimed hardship rise to the level of arbitrary
    or unreasonable hardship.
    A further feature of a variance is that it is, by its nature, a temporary reprieve from
    compliance with the Board's regulations, and compliance is to be sought regardless of the
    hardship which the task of eventual compliance presents an individual polluter. (Monsanto
    Co. v. Pollution Control Board, 67 Ill.2d 276, 367 N.E.2d 684 (1977).) Accordingly, except
    in certain special circumstances, a variance petitioner is required, as a condition to grant of
    variance, to commit to a plan which is reasonably calculated to achieve compliance within the
    terms of the variance.
    COMPLIANCE PLAN
    The District states that the project start date was Fall 1996 and that the rehabilitation
    project is estimated to take four months. (Pet. at 3.) The District asserts that "[c]ompliance
    has been maintained during the past several years, however, corrective repairs at this time to
    the tertiary facility will assure continued reliability of the tertiary facility in the future." (Pet.
    at 3.) DeKalb claims that the past efforts to achieve compliance have included two provisional
    variances to allow for filter renewal which included sandblasting and painting as well as some
    structural improvements. (Pet. at 3.) The District maintains that the current project should
    provide it with a “new” filter process that should achieve and maintain compliance. (Pet. at 2-
    3.)
    The District states that other compliance alternatives such as construction of alternative
    sand filtration facilities would be cost prohibitive and there is no suitable space near the
    existing facility. (Pet. at 3.) The District also considered storage of the wastewater flow but
    because the total daily wastewater flow, which is about six million gallons per day, goes
    through the sand filter, storage for four months (the projected time necessary for rehabilitation)
    is not feasible.
    The District scheduled this work and requests variance relief for the winter months
    because the plant flows are lower, more predictable during those months, and Northern Illinois
    University is on vacation for about four weeks during this time. (Pet. at 3.) The District
    claims that it will utilize the remaining treatment components to maximum efficiency by re-

    6
    calculating and using additional primary clarifiers to enhance suspended solids and CBOD
    5
    removal. (Pet. at 4.) The District states that the analysis of the wastewater prior to the sand
    filtration treatment facility has indicated the following mg/1 concentrations:
    CBOD
    5
    TSS
    Monthly Average
    10 mg/1
    25 mg/1
    Daily Maximum
    20 mg/1
    42 mg/1
    The District’s belief is that it can achieve the following numerical interim discharge limits:
    CBOD
    5
    TSS
    Monthly Average
    15 mg/1
    30 mg/1
    Daily Maximum
    30 mg/1
    50 mg/1
    The District states that "[t]he requested interim discharge limits suggested are a bit higher than
    those seen prior to the sand filtration process, thus allowing a little room for wet weather
    flows, if any are experienced over the duration of the variance." (Pet. at 4.)
    The Agency states that the District's project will ensure compliance in the future and
    continued protection of the environment. (Rec. at 3.) The Agency also maintains that the
    District's monthly averages for those contaminants have been well below the permit limits for
    the past twelve months. (Rec. at 4.)
    ENVIRONMENTAL IMPACT
    The District states that there will be no adverse impact upon the receiving stream
    during the tertiary facility rehabilitation. (Pet. at 3.) The District asserts that the months of
    scheduled rehabilitation (November, December, January, and February) are normally below
    average in organic discharge from the treatment facility and rarely experience the high flows
    associated with Spring and Summer months. (Pet. at 3.) Finally, the recreational activity in
    the receiving stream is non-existent during the aforementioned months. (Pet. at 3.)
    The Agency states that after review of the facts in this matter, it agrees with the
    District's statement that no adverse environmental impact is anticipated on the receiving stream
    during the rehabilitation project. (Rec. 4-5.)
    HARDSHIP
    The District asserts that compliance with 35 Ill. Adm. Code 304.141 and 304.120
    would impose an arbitrary or unreasonable hardship upon it for the following reasons:

    7
    (a)
    There is no question that the sand filters are in dire need of rehabilitation and
    renewal. Unfortunately, filter requires temporarily taking this part of the
    wastewater treatment process off-line and out of service; and
    (b)
    Alternative methods to assure compliance with NPDES CBOD
    5
    /TSS limits are
    either cost prohibitive or physically impossible.
    The Agency agrees that denial of this variance would pose an arbitrary and
    unreasonable hardship on the District during the tertiary filter rehabilitation project, as
    described in Section 35(a) of the Act. (Rec. at 2-3.) Additionally, the Agency asserts that the
    granting of this variance request, with the conditions described below, should allow the
    District to continue to operate its facility during the tertiary filter rehabilitation project without
    the possibility of violating the Board's regulations and consequently facing enforcement action.
    CONSISTENCY WITH FEDERAL LAW
    The District provides no statement as to whether the grant of the requested variance
    would be consistent with federal law. The Agency states that there are no applicable federal
    laws or regulations which would preclude the granting of this variance.
    CONCLUSION
    Based on the record, the Board finds that the District has established that immediate
    compliance with 35 Ill. Adm. Code 304.120(c) and 304.141(a) constitutes an arbitrary or
    unreasonable hardship. The Board also finds that the temporary relief provided by this
    variance does not pose a risk to environmental health. The District has demonstrated the
    impact to the environment will be minimal during the variance period. The District's
    requested interim effluent limitations are only slightly higher than the applicable limitations to
    allow for wet weather flows if any are experienced. Additionally, we agree that the granting
    of variance will be consistent with federal law.
    The District requested that the variance term start upon the initiation of the bypassing
    of the tertiary filter system and continue for four months. The Board cannot determine from
    the record if the tertiary filter has been bypassed or when it will be bypassed. Since the
    District argues that the environmental impact will be minimal during the winter months and
    that rehabilitation is scheduled for November, December, January, and February the Board
    will start the variance term as of the date of this order and end the variance term on March 31,
    1997 to ensure the environmental impact is minimal.
    This opinion constitutes the Board findings of fact and conclusions of law in this
    matter.
    ORDER

    8
    The Board hereby grants the DeKalb Sanitary District a variance from 35 Ill. Adm.
    Code 304.141(a) and 304.120(c) so that it may complete its rehabilitation of its facility. The
    variance is subject to the following conditions:
    1.
    The variance shall commence upon the date of this order if initiation of
    bypassing of the tertiary filter system has begun and continue until March 31,
    1997;
    2.
    During the period of the variance, the effluent discharged shall meet the
    following limits, expressed in milligrams per liter:
    CBOD
    5
    TSS
    Monthly Average
    15
    30
    Daily Maximum
    30
    50;
    3.
    All other terms and conditions of DeKalb Sanitary District’s NPDES permit will
    remain in effect during the variance period;
    4.
    The DeKalb Sanitary District shall notify Eugene Forster, Illinois
    Environmental Protection Agency, Field Operations Section, Rockford Regional
    Office, at (815) 987-7755 when work on the tertiary filters begins, or began,
    and again when the filters are returned to service. Written confirmation of each
    notice shall be sent within five (5) working days to the following address:
    Illinois Environmental Protection Agency
    Bureau of Water
    Compliance Assurance Section
    2200 Churchill Road
    Post Office Box 19276
    Springfield, Illinois 62794-9276
    Attn: Mark T. Books
    5.
    During this variance, the DeKalb Sanitary District shall operate its wastewater
    treatment facility so as to produce the best effluent practicable. Additionally,
    the DeKalb Sanitary District shall perform the necessary work on the tertiary
    filters as expeditiously as possible to minimize the time period the filter is out of
    service;
    IT IS SO ORDERED.
    Board Member K. M. Hennessey abstained.

    9
    If the petitioner chooses to accept this variance subject to the above order, within forty-
    five days of the grant of the variance, the petitioner must execute and forward the attached
    certificate of acceptance and agreement to:
    Charles W. Gunnarson, Assistant Counsel
    Illinois Environmental Protection Agency
    Division of Legal Counsel
    2200 Churchill Road
    Post Office Box 19276
    Springfield, Illinois 62794-9276
    Once executed and received, that certificate of acceptance and agreement shall bind the
    petitioner to all terms and conditions of the granted variance. The 45-day period shall be held
    in abeyance during any period that this matter is appealed. Failure to execute and forward the
    certificate within 45-days renders this variance void. The form of certificate is as follows:
    CERTIFICATION
    I (we), ____________________________________________, hereby accept and agree
    to be bound by all terms and conditions of the opinion and order of the Pollution Control
    Board in PCB 97-78, January 23, 1997.
    Petitioner
    __________________________________________
    Authorized Agent
    __________________________________________
    Title
    __________________________________________
    Date
    Section 41 of the Environmental Protection Act (415 ILCS 5/41) provides for the
    appeal of final Board orders within 35 days of the date of service of this order. (See also 35
    Ill. Adm. Code 101.246, Motion for Reconsideration.)
    I, Dorothy M. Gunn, Clerk of the Illinois Pollution Control Board, hereby certify that
    the above opinion and order was adopted on the ________ day of ___________________,
    1997 by a vote of _______.
    ___________________________________
    Dorothy M. Gunn, Clerk
    Illinois Pollution Control Board

    10