ILLINOIS POLLUTION CONTROL BOARD
    March
    3,
    1977
    HOMER
    GRAIN COMPANY,
    )
    Petitioner,
    )
    v.
    )
    PCB 76—312
    )
    ENVIRONMENTAL PROTECTION AGENCY,
    )
    )
    Respondent.
    OPINION
    AND
    ORDER OF
    THE
    BOARD
    (by Dr. Satchell):
    On December
    6, 1976 Homer Grain Company petitioned the
    Pollution Control Board for a variance from Rule 203(d) (9) (B)
    of the Board’s Chapter 2: Air Pollution Control Regulations
    (Chapter 2).
    The Environmental Protection Agency’s
    (Agency)
    recommendation in this matter was filed on February 1,
    1977.
    Homer Grain seeks a variance from Rule 203(d) (9) (B)
    of
    Chapter 2 until October
    1,
    1978 in order to install certain
    air pollution equipment.
    April
    30,
    1977 is the date by which
    Homer Grain is required to achieve compliance with this regu-
    lation.
    Homer Grain operates a grain handling and drying
    operation in Homer, Illinois in Champaign County.
    Homer
    is a
    city of approximately 1400 people.
    The facility is engaged
    in
    receiving, storing, cleaning, drying, handling and shipping
    whole kernel grain.
    The elevator employs
    12 people with an
    annual payroll of $200,000 per year and purchases approximately
    $300,000 worth of operating supplies in Champaign County.
    Approxi-
    mately 10,000,000 bushels of grain are received and shipped every
    year.
    In the qrain facility are several dump
    piU
    do~cribedby the
    Agency
    d S
    lo!
    Iows
    Dump pit Bi, annual throughput
    -
    2,000,000 bushels
    Dump
    pit B2, annual throughput
    250,000 bushels*
    Dump
    pit B3, annual throughput
    850,000 bushels
    Dump pit Gl, annual throughput
    -
    3,400,000 bushels
    Dump pit G2, annual throughput
    -
    2,600,000 bushels
    Dump pit Cl, annual throughput
    less than 300,000
    bushels.
    *“~n
    air pollution control scheme will be installed on pits Bl,
    132
    and B3,
    since they receive dry grain in excess of 300,000
    bpy each.”
    (Pet.
    2).
    25-39

    —2—
    There are three grain dryers with individual capacities of
    6,000
    bushels per hour
    (BPH), 4,000 BPH and 1,500 BPH.
    There
    are also numerous storage units and numerous items of convey-
    ing equipment at the facility.
    By December
    1,
    1976 all three
    dryers
    should have been in compliance with Rule 203(d) (9) (C)
    of Chapter
    2.
    Emission controls on dump pits Bl,
    B2, and B3 are sched-
    uled to be installed and placed in operation no later than
    December 31, 1977.
    The elevator has an elevated belt con-
    veyor for which a dust collection control is presently being
    installed and is due to be placed in operation during the
    early part of 1977.
    The Agency states that it has discussed the proposed
    control program with representatives of Homer Grain on
    several occa~ionsduring the past few months and has learned
    additional facts not specified in the variance petition.
    Presently,
    Petitioner does not intend to install pollution
    control equipment on major dump pits Gi and G2 due to sev-
    eral factors.
    Both dump pits are quite small
    in actual
    volume which makes the pits unsuitable for retrofitting
    conventional aspiration type controls.
    Furthermore, Peti-
    tioner has not yet ascertained whether the operation of these
    two dump pits causes excessive emissions.
    Both dump pits are
    used primarily for the receiving of wet corn which makes the
    emissions much less than if the pits received dry corn.
    Dur-
    ing the harvest season these pits are run almost on a constant
    basis.
    Because of these factors the Agency states
    it is willing
    to allow Homer Grain to operate pits Gl and G2 after the con-
    trols are installed on the other
    dump
    pits to see whether the
    operation of pits Gi and G2 causes excessive emissions.
    Accord-
    ing to the Agency,
    if excessive emissions are created Homer
    Grain has agreed to control the pits satisfactorily or cease
    using them permanently.
    Operation of pits Gi and G2 subse—
    quent
    to December
    31, i977 will be
    done
    For
    purposes
    of
    receivinq
    WUL
    qrdi
    ii
    only.
    Homer
    Grain also stated to the Agency that other emission
    sources wou1d~be controlled.
    This includes
    a conveyor belt that
    transfers grain from the dryers to storage units.
    According to
    the Agency this conveyor belt will be controlled no later than
    October
    1,
    1978.
    The Agency further states that Homer Grain
    agreed to control the railroad loadout system no later than
    October
    1, 1978 and to replace cyclones
    at the top of the work-
    house by October
    1,
    1978.
    The Agency has observed the cyclones
    25
    40

    —3—
    to be frequently clogged and ineffective as emission controls.
    During the Agency investigations in the past there has been
    evidence of poor maintenance concerning the cyclones and the
    elevated conveyor belt; however, this should be remedied with
    equipment with reduced maintenance requirements.
    The Agency has not received full details on the emission
    control equipment for the railroad load out system;
    however,
    the Agency has received several aspects of this program, in-
    cluding construction permit applications and has found the
    program to date favorable.
    The Petitioner and the Agency have
    agreed upon a schedule for construction permit applications for
    all control ç~eviceswhich have not yet received construction
    permits.
    Homer Grain has replaced three rack type dryers with
    column type dryers at a cost of $550,000.
    It is not clear
    from the petition that this was solely for the control of
    emissions.
    Other expenditures to control emissions are pro-
    jected to be approximately $300,000
    (Rec.
    5).
    The nearest ambient air monitoring station to Homer is
    in Champaign,
    a distance of fifteen miles.
    During 1975, at
    the Champaign station, the average annual geometric mean for
    particulate matter was 46 micrograms per cubic meter, well
    within the allowable standards.
    During the same period the
    maximum 24-hour concentration was not exceeded.
    In 1976 one
    sample has exceeded the 24—hour maximum.
    The Agency does not
    regard this
    as necessarily characteristic of the air quality
    within Homer, Illinois.
    Petitioner states that investment in pollution control
    devices have created cash flow problems and that should acceler-
    ation of the plan be necessary the business would be jeopardized.
    The Agency states that since Petitioner’s program is substantial
    and reasonable
    it recommends that the Board endorse the program
    subject to express conditions.
    The Agency states that complaints have been received about
    Petitioner’s operations in the past.
    One complainant in par-
    ticular expressed doubt as to whether Petitioner’s program was
    adequate.
    The Board has received one objection to the grant of
    variance which gives a detailed complaint.
    Petitioner’s com-
    pliance plan as presented by the Petitioner and the Agency if
    properly pursued should eliminate many if not all of the
    objector’s complaints.
    25
    41

    —4—
    Petitioner’s hardship is apparently one of time.
    Petitioner cannot do an adequate job of controlling
    particulate matter by April
    30,
    1977.
    The Board agrees
    with the Agency that the program proposed
    is reasonable.
    Under these circumstances the Board will grant Petitioner
    a variance subject to the Agency’s suggested conditions.
    In addition, the Board will require a performance bond for
    $100,000
    to be posted with the Agency with release based
    upon compliance.
    This Opinion constitutes the Board’s findings of fact
    and conclusions of law in this matter.
    ORDER
    The Pollution Control Board hereby grants Homer Grain
    Company a variance from Rule 203(d) (9) (B)
    of the Chapter
    2:
    Air Pollution Regulations until October 1,
    1978 subject to
    the following conditions:
    1.
    Only grain that needs conditioning shall be placed
    in dump pits designated as Gl and G2 after Decem-
    ber 31,
    1977.
    2.
    A construction permit application for an emission
    control system for the dump pits designated Bi, B2,
    and 33 shall be submitted to the Agency no later than
    July
    1,
    1977.
    That emission control system as des-
    cribed in the construction permit application shall
    achieve compliance with all applicable standards no
    later than December 31, 1977.
    3.
    The dry grain conveyor system, designated as Cony.
    Dl on page 15 of the variance petition, shall be
    equipped with an emission control system capable of
    achieving compliance with all applicable standards
    no later than October 1, 1978.
    4.
    A construction permit application for an emission
    control system for the railroad load out process shall
    be submitted no later than July 1,
    1977.
    That emission
    control system as described in the construction permit
    application shall achieve compliance with all applicable
    standards no later than October 1,
    1978.
    5.
    A construction permit application for an emission
    control system to replace the cyclones on top of the
    25 —42

    —5—
    workhouse shall be submitted to the Agency no
    later than ~Ju1y1,
    1978.
    That emission control
    system as described in the construction permit
    application shall achieve compliance with all
    applicable standards no later than October
    1,
    1978.
    6.
    The elevated, reversible conveyor belt which
    traverses Maple Street shall be equipped with
    an emission control system capable of achieving
    compliance with all applicable regulations no
    later than April
    1,
    1977.
    7.
    Petitioner shall post a performance bond in the
    amount of $100,000 with the Agency to assure the
    construction required for compliance.
    The bond
    will be submitted to:
    Environmental Protection Agency
    Control Program Coordinator
    Division of Air Pollution Control
    2200 Churchill Road
    Springfield, Illinois 62706
    8.
    Within thirty-five days of this order Homer Grain
    shall execute and forward to the:
    Control Program Coordinator
    Division of Air Pollution Control
    2200 Churchill Road
    Springfield, Illinois 62706
    a Certification of Acceptance and Agreement to be
    bound to all terms and conditions of this variance.
    The form of that Certification shall be as follows:
    CERTIFTC1~TION
    I
    (We),
    ______________________________,
    havinq read and
    fully understa;d±ngthe Order of the Illinois Pollution
    Control Board in PCB 76-312, hereby accept said Order and
    agree to be bound by all the terms and conditions thereof.
    Signed by_
    Title
    Date
    IT IS SO ORDERED.
    25
    43

    —6—
    I, Christan L. Moffett, Clerk of the Illinois Pollution
    Control Board, hereby c~tifythe above Opinion and Order
    were adopted on the
    ~
    day of
    ¶~44.~L
    ,
    1977 by a
    vote of
    .~.
    c~
    .
    .
    Christan L. Moffe4
    lerk
    Illinois Pollutioi4~-ControlBoard