ILLINOIS POLLUTION CONTROL BOARD
    June 28, 1977
    REVERE COPPER AND RA, INC.,
    Petitioner,
    v.
    )
    PCB 76—246
    ENVIRONMENTAL PROTECTION AGENCY,
    )
    Respondent.
    CONCURRING OPINION (by Mr. Dumelle):
    While I agree with the decision I find nothing in this
    record that indicates the reason for the long delay by Revere
    in fashioning a compliance program.
    The Board adopted its Effluent Criteria (R70-8) on January
    6, 1972. These standards became effective December 31, 1973.
    Now, almost four years after the effective date of this
    regulation, we
    are
    granting a five year variance, presumably
    from today’s date. Nothing in this record tells what Revere did,
    if anything, in the 1972-73 period after Board passage of the
    Effluent Criteria and before its effective date. Is this a
    self-imposed hardship? We just do not know and I give Revere
    the benefit of the doubt since their Petition is thorough and
    well researched.
    flRespectfix1~l~~ubmitte
    ~
    Jacob D. Dumelle
    I, Christan L. Moffett, Clerk of the Illinois Pollution Control
    Board, herebX certify the above Concurring Opinion was submitted
    on the
    3/~LJ~
    day of
    ___________,
    1977.
    Christan L. Mo fe~k~Cler
    Illinois Pollution Control Board
    26-33

    Back to top