ILL:rNors
PO~LUTION
CONTROL
BOARD
N~iveiuber
10,
1977
LEWIS
AND
CLARK
uMMUN1T~ UOLiA~~.
)
P~tiL
~L)tiCj,
)
V.
)
POE 77—220
ENVIRONMENTAL PROTECTION AGENCY,
Respondent.
OPINION
AND
ORDER OF THE BOARD
(by
Mr.
Dumelle):
Petitioner
is requesting an extension of a prior variance
from the requirements of Rule 404 of Chapter
3: Water Pollution
of the Board’
Rules and Regulations.
On May 12, 1977
in PCB
76—327 the Board noted that the Petitioner had made a good faith
effort toward maintaining a quality effluent from its sewage
treatment plant.
A variance was q~mted until September
1,
1977
because the completion of the
GodiLey
Sewage Treatment Plant
was
anticipated by that date.
Since May 12,
1977 Petitioner has substantially complied
with the conditions imposed in
its
variance,
but the Godfrey
Sewage Treatment Plant is
still not ready to accept Petitioner’s
effluent.
Petitioner has stated
that
it is ready to connect
but that the Godfrey Plant may not be ready until January
1, 1978.
The Agency has indicated that April
30,
1978 may be
a more
realistic date.
The records
in PCB 72~-246, 74-81,
75—164,
and 76—327 are
hereby incorporated into the record of this proceeding.
Petitioner shall be required to meet the same interim
conditions until it is able to complete its connection.
Denial of
a variance from Rule 404(f)
of Chapter
3 would
constitute
an arbitrary or unreasonable hardship upon Petitioner.
This Opinion constitutes the Board’s findings of fact and
conclusions of law in this matter.
ORDER
A variance from Rule ~04(f)
of Chapter
3: Water Pollution
of the Board’s Rules and Regulations is hereby granted until
April
30, 1978 or the completion of the Godfrey Sewage Treatment
Plant, whichever occurs first,
subject to the following conditions:
28
—
187
a.
Efflnent from
Petitioner’s
sewagn nirat~entplant
shall not exceed 20 mg/i BOD
and
25
mg/i
suspended
solids on a monthly average;
b.
Petitioner shall take all
necessary
steps
to
ensure that the sewage treatment
plant
effluent
does
not exceed 400 fecal coliform/lOOmi;
c.
Petitioner
shall
not
increase
the
waste
load to its
sewage treatment plant
beyond
its
designed
capacity;
d.
Petitioner
shall maintain
its
interceptor line
so that it
is ready for
connection
at
the time the
Godfrey Sewage Treatment Plant is
placed
in operation.
e.
Within
35 days of
the
Board~s
final
Order herein,
Petitioner
shall
execute
and
forward
~
the:
Variance Section
Division of Water Pollution Control
Illinois Environmental Protection Agency
2200 Churchill
Road
Springfield,
Illinois
62706
Attention:
Mr. Robert Mulvey
a Certification of Acc~Lance and agreement to be bound
to all terms and conditions of the variance,
The form
of said Certification
shall
be
as
follows:
CERTIFICATION
I,
(We)
____________________
____
_____________
having read and
fully understandf~the Order of the
Illinois Pollution Control Board
in
POE 77-220, hereby
accept
said
Order
and agree to be bound by all the terms
and conditions thereof.
Signed by
___
_______________
Title
*
__________________
Date
___________________
IT
IS
SO
ORDERED.
I, Christan L. Moffett, Clerk
of
the Illinois Pollution
Control Board, hereb1 certify the above Opinion and Order
were
adopted on the
/~
day of
~
1977 by a vote
of
______
~
~)/y)
~
Christan L.
Moffett,
k
Illinois Pollution
ol Board
2R
—
1S~