ILLINOIS POLLUTION CONTROL BOARD
    November 18, 1999
    PEOPLE OF THE STATE OF ILLINOIS,
    Complainant,
    v.
    RODGERS ENGINEERING CORPORATION,
    Respondent.
    )
    )
    )
    )
    )
    )
    )
    )
    )
    )
    PCB 00-86
    (Enforcement - Air)
    ORDER OF THE BOARD (by C.A. Manning)
    A complaint in the above captioned matter was filed on November 15, 1999. The complaint
    alleges that the respondent violated specified provisions of the Environmental Protection Act (Act)(415
    ILCS 5.1
    et seq
    . (1998)) and the Board’s regulations. The complaint alleges that violations occurred at
    a facility located in Kane County, Illinois and at two facilities located in DuPage County, Illinois. The
    Board accepts this matter for hearing.
    The Board directs that this matter proceed to hearing as expeditiously as practicable. The
    assigned hearing officer must set the matter for hearing in accordance with the requirements of the Act
    and the Board's procedural rules. Accordingly, this matter must be set for hearing within 90 days after
    the filing of the complaint unless the hearing officer, after appropriate consultation with the parties,
    determines that a later date is appropriate and that no undue delay or material prejudice in the resolution
    of this matter would result. See 35 Ill. Adm. Code 103.125(a). In any event, it is the responsibility of
    the hearing officer to guide the parties toward prompt resolution or adjudication of this matter, through
    whatever status calls and hearing officer orders he or she determines are necessary and appropriate.
    IT IS SO ORDERED.
    I, Dorothy M. Gunn, Clerk of the Illinois Pollution Control Board, hereby certify that the above
    order was adopted on the 18th day of November 1999 by a vote of 6-0.
    Dorothy M. Gunn, Clerk
    Illinois Pollution Control Board

    Back to top