ILLINOIS POLLUTION CONTROL BOARD
    April 27, 1978
    CENTRAL ILLINOIS PUBLIC SERVICE
    COMPANY,
    Petitioner,
    v.
    )
    PCB 77—158
    ENVIRONMENTAL PROTECTION AGENCY,
    Respondent.
    THOMAS L. COCHRAN, SORLING, NORTHRUP,
    HANNA,
    CULLEN & COCHRAN,
    APPEARED ON BEHALF OF PETITIONER;
    ANN L. CARR, ASSISTANT ATTORNEY GENERAL, STATE OF ILLINOIS,
    APPEARED ON BEHALF OF RESPONDENT.
    OPINION AND ORDER OF THE BOARD (by Mr. Goodman):
    On May 31, 1977 Central Illinois Public Service Company
    (CIPS) filed this Petition pursuant to Rule 203(i) (10) of the
    Board’s Water Pollution Regulations, Chapter 3 (Regulations).
    Rule 203(1) (10) provides for Board promulgation of specific
    thermal water quality standards to be applied to an artificial
    cooling lake upon satisfactory demonstration to
    the
    Board that
    the lake will be environmentally acceptable. Hearing was held
    in this matter on October 2, 1977; there were no members of the
    public present, and no public comment has been received by the
    Board.
    Co
    I
    leon
    Luke, LIie subject of this
    Pc
    Li
    Lion,
    is
    wi ar
    Lifi—
    cial cooling lake formed by the construction of a dam across
    the McDavid Branch of the East Fork of Shoal Creek in 1963.
    The purpose of the lake was to supply cooling capacity for CIPS’
    Coffeen Power Station located in Montgomery County a few miles
    south of Coffeen, Illinois. Due to the rolling terrain in this
    area, the lake formed by the dam has the convoluted configuration
    shown
    in
    Figure 1. The average depth of Coffeen Lake is 18 feet;
    the maximum depth is 52 feet. The dam is about 1200 feet from
    the East Fork of Shoal Creek, the first 350 feet of that distance
    30-77

    //~
    —P..——
    DRAWPIG
    8F
    cip~cO1~EEuLkKE

    —3—
    being a concrete spiliway. The area between the spillway and the
    East Fork of Shoal Creek consists of an earthen channel with trees,
    dirt, etc. The Station’s condenser cooling water travels through
    a half-mile flume which discharges over a spillway into the Lake.
    The total length of the cooling water path from the discharge point
    to the intake point is about 4 miles, the cooling loop running from
    discharge to intake without entering that portion of the Lake which
    is upstream from the intake.
    The Lake was designed orginally to serve as a settling basin
    for overflow from the ash ponds and also received runoff from the
    coal pile, regenerative wastes, and various other effluents re-
    sulting from the operation of the Station (R. 323). Coal is brought
    to the Station by conveyor belt from the mouth of a mine located
    adjacent to the Power Station. From September, 1966 until July,
    1969, the Lake was leased to the Illinois Department of Conser-
    vation and was officially open to the public. The Department of
    Conservation terminated its rights as Lessee in 1969, apparently
    due to an internal administrative decision assessing priorities.
    In 1964, 250,000 large mouth bass fingerlings were released by
    the Department of Conservation, and in 1966, some fiddler channel
    catfish were released by a local club, and a private individual
    released some 200 white crappies. CIPS has undertaken no fish
    management practices of any kind, and since 1969 the Lake has not
    been opened to the public, although some people continue to fish
    the Lake as trespassers (R.52, 79)
    .
    All of the foregoing infor-
    mation was -taken from CIPS’ Thermal Demonstration (TD)
    ,
    unless
    otherwise noted.
    Rule 203(1) (10) states that a Petitioner must meet certain
    requirements before the Board will promulgate specific thermal
    standards to be applied to Petitioner’s discharge to an artificial
    cooling lake. The first requirement is that all discharges from
    the artificial cooling lake to other waters of the state comply
    with applicable provisions of Rule 203(1) (1—4)
    .
    In general this
    Rule requires that there be no abnormal temperature changes that
    may adversely affect aquatic life, that the normal daily and
    sr~nsrnu
    1
    eml)(rflLlr(’
    fi
    uctuat~ons
    he Ifid 1 nI
    ui
    iied,
    I
    hut I he max imuin
    tempera Lure r i se above natural
    tempera Lures ~hu I. I not exceed
    ~
    and that the water temperature at representative
    locations in the
    main river shall
    not exceed the maximum limits
    which are
    indicated
    during more than 1 of the hours in the 12 month period ending with
    any month. In addition, at no time shall the water temperature at
    such locations exceed the maximum limits as indicated by more than
    3°F. The indicated maximum temperature of interest to this pro-
    ceeding is 90°F.
    30-79

    4—-
    It is apparent from the data and the briefi; presented by both
    parties that little or no discharge
    to
    other waters of the State
    has occurred since Coffeen Lake was established in 1965. The
    Agency argues that CIPS has fai:Led -to show compliance with Rule
    203(i) (1—4) since nO studies
    have been done either on the receiving
    water, Shoal Creek,- -or on the effect upon it by discharges from
    Coffeen Lake. Considering the apparent lack
    of discharge to
    Shoal
    Creek, the Board finds that any studies made by CIPS would have
    been, at best, a waste of time and, at worst, misleading and non-
    conclusive. In order to measure the impact of a discharge, one
    must first presume the existence of a discharge capable of having
    an impact. The Board finds in this case U~t such a discharge has
    not existed with-respect to Coffeen Lake arid
    therefore finds CIPS~
    presentation witI~i respect to 203(i) (10) (aa) sufficient.
    Rule 203(i)(l-0)(bb) provides that the heated effluent dis-
    charge to Coffeen Lake must comply with al:L applicable provisions
    of Chapter 3 other than Rule 203(1) (1-4). Data and testimony
    presented by CIPS (R.l4) along with a variance granted by the
    Board in PCB 77-221, convinces the Board that CIPS is in compli-
    ance with Rule 203(i) (10) (bb)
    .
    In addition, the Agency, on page
    5 of its brief herein states “the EPA does not in this
    proceed-
    ing dispute the general allegation of
    CIPS that Rule 203(1) (10)
    (bb) has been complied with”.
    Rule 203(i) (10) (cc) calls for a demonstration by CIPS to the
    Board that Coffeen Lake will be
    environmentally
    acceptable and
    within the intent of the Act
    notwithstanding the
    proposed speci-
    fic thermal standard. Such- a
    showing must include, but is not
    limited to,
    conditions capable of supportinq shellfish and wildlife
    and recreational uses consistent
    with good r n~gement practices
    and consideration of the control of the th. ii component of the
    discharger’s effluent by a technologicall’, L~asible and economic-
    ally reasonable method. At the hearing held herein CIPS presented
    its Thermal Demonstration along with two addenda designed to keep
    the demonstration current (Exhibits 1, 2, and 3). The Agency
    fl
    led
    a response to .CTPS
    presenta t:. ion recomm ‘ud i
    ~uj
    the I the a 1
    ter—
    nate
    thermal limits requested
    be
    denied,
    The Agency
    points out;
    t:hat; the water temperatures
    in Coffeen Lake are quite high when
    compared with noncooling lakes in
    Illinois, that CIPS had failed
    to discuss the possibility of modification of a flow pattern of
    the cooling water or utilization of the cool hypolimnetic layer
    by mixing, and that CIPS had failed to address -the environmental
    impact
    of a proposed increase
    in the amount of water pumped from
    Shoal Creek to achieve a discharge over the spiliway of the dam.
    Testimony at the hearing by Richard J. Grant, CIPS’ water
    quality engineer, concerning the possible modification
    of the
    30-80

    —5—
    cooling loop to include the surface area of the entire Lake, indi-
    cated that such a project
    would be very expensive.
    In addition,
    since the area in question is the upstream portion of the Lake,
    additional equipment would have to
    be installed to treat the higher
    level of collodial silica which
    occurs due to the influx
    of runoff
    at that point (R.l4—20).
    More importantly,
    such a modification
    would, while lowering the average temperature of the hot portions
    of the Lake, destroy the portions of the Lake which are now at a
    much lower temperature and undoubtedly used by the fish as a refuge
    during the hot summer months when temperatures within the
    cooling
    loop are uncomfortable for them. The result could be a Lake
    whose
    entire area is uncomfortably warm for the fish and provides no place
    for them to find refuge. The higher tempera-Lure within the
    limited
    cooling loop would also afford a higher
    rate of heat transfer per
    square foot of surface area of heated water, although total heat
    evolution from the Lake would necessarily have to be the same in
    either case assuming constant lake temperature. The Board finds,
    therefore, that the known existing conditions are preferable to
    the unknown results of a very expensive modification to the cooling
    loop. The same evaluation applies to the possibility of mixing the
    cool lower levels of the Lake with the heated portions within the
    cooling loop.
    Section 10 of the Thermal Demonstration addresses the techno-
    logical feasibility and economic reasonableness of controlling
    the thermal component of-the discharge through the use of cooling
    towers. The estimated construction and equipment cost and capi-
    talized operating costs for Coffeen Lake as developed by Sargent
    and Lundy amounts to approximately $20,000,000. In addition CIPS
    points out the well known environmental problems concerned with
    the plume from cooling towers. The Agency did not address the
    question of cooling towers.
    The major question in this matter is whether Coffeen Lake
    will be capable of supporting shellfish, fish and wildlife and
    recreational uses consistent with good management practices, even
    if such uses are not actually instituted. In the Opinion support-
    ing the Order
    in the Cooling Lakes Regulation, P75—2, adopted on
    September 29, 1975, the Board made the following comment concern-
    ing Sub—section (cc) (1) of the Rule:
    Under subsection (cc) (1), it is not absolutely
    required that there be a fishery, or that an
    artificial cooling lake provide recreational
    or any other uses except that for which it was
    designed. One public comment pointed out that
    factors besides generating plant operations
    might prohibit a recreation facility.24 But
    30-81

    it is nonetheless felt hhat; by
    requiring such
    conditions in a lake we will
    have taken a sig-
    nificant
    step in proLe-e~±x;qwater quality.
    Qualitatively, while the end use of a body
    of water is indeed
    important, and may be weighed
    by the regulatory process,
    the Board is most
    con-
    cerned with assuring water quality sufficient to
    allow these (fishery and recreational) and any
    other beneficial and ecologically—sound uses. We
    may not require that water he properly and bene-
    ficially used; we must raquirc ~at it can be used
    (emphasis added).
    In this case, Coffeen Lake is not officially
    being used for any
    purpose other than that for which ii: was designed. The question
    before the Board therefore is whether or not conditions exist
    which might allow for uses as noted in Section (cc) (1) of Rule
    203(i) (10)
    Most of
    the testimony adduost
    oh the hearing concerned the
    plants and animals constituting Lhe food chain in the Lake and
    their ability to support a fishery. The quick answer to the
    question is that Coffeen Lake does
    indeed
    contain a variety
    of
    fish including those stocked previously
    as noted above. There
    was no indication in the record
    that
    the Lake sustains any par-
    ticularly dramatic fish kills, there being
    in fact only three
    recorded during the life of
    the
    Lake,
    apparently the worst of
    which concerned some 80 to 100 gizzard sh -d found during the
    period of startup of the second unit (R-4’-SS, Thermal Demon-
    stration Figures 8a-1, 8a—2)
    .
    In addition, evidence presented
    at the hearing indicates’that fishing
    doe
    occur on the Lake not-
    withstanding the fact that there is no i--- .Lic access thereto. The
    Agency, while not seriously
    questioning
    the existence of a fishery
    in Coffeen Lake, does question the condition of that fishery and
    its continued viability in the future.
    i
    le
    jenera
    I I.y
    questioneng tOe amount (1 1a1 a used
    by Ci PS
    to support; i l:s Thermal I)ernonstrritio;i
    ,
    thc Aqency spec;Lfical ly
    questions the condition of the
    fish, the
    abundant concentrations
    of blue-green algae, the continuing drop of
    alkalinity and bicar-
    bonates over the last eleven years,
    and the ability of the fish
    to survive the heated water during the summer months. The Agency’s
    questions focus primarily upon what might be the future of Coffeen
    Lake rather than its existing conditions. Although the Board
    would agree with the Agency that the.
    data presented by CIPS might
    well be described as minimal in both quality and quantity, we
    find that it is sufficient when considered along with the history
    and the present situation of the Lake. As an example, -the ability
    30~-82

    —7—
    of the fish to survive the heated water during the summer months
    has certainly been proven. There have been no recorded fish
    kills of any consequence during Lee entire life of the Lake, and
    the fish stocked some twelve years previous are still present in
    the Lake in quantities sufficient to attract fishermen despite
    the lack of subsequent stocking or fishery management during that
    period. The Board finds that survival of fish subsequent to a
    single stocking for a period of twelve years is sufficient evi-
    dence that Coffeen Lake in its present condition will support a
    viable fishery. The Board again emphasizes that it is not
    necessary that CIPS create and sustain a fishery in Coffeen Lake
    but rather that Coffeen Lake be in such a condition as to allow
    the presence of a fishery.
    With respect to the other concerns of the Agency about the
    concentration of algae and the drop of alkalinity and bicarbonates,
    the Board finds that these concerns, altho~wjhlegitimate, go more
    to the chemical and physical condition of Oaffeen Lake than to the
    effects of the thermal constituent of dPi discharge. The Board,
    however, is concerned about these conditions in Coffeen Lake and
    about the effect of the changes, including construction of a new
    treatment plant and proposed continuous discharge over the dam,
    now being instituted and proposed by CIPS to correct them, especi-
    ally with regard to the effect upon the -temperature of Coffeen Lake
    and Shoal Creek. (P.91, 92, Thermal Demonstration). Because of
    this concern, the Board finds that a permanent specific thermal
    standard for Coffeen Lake is not warranted at this time. The Board
    will set interim thermal standards for Coffeen Lake as requested by
    CIPS for a period of three years. At
    the end
    of that three year
    period and upon a showing before the Board by CIPS that Coffeen
    Lake meets the criteria of Rule 203(i) (10).. ;hese specific thermal
    standards shall become permanent.
    This Opinion constitutes the findings of fact and conclusions
    of law of the Board in this matter.
    ORDI~R
    it is the Order of the Pollution Control Board that:
    1. For the period of time ending three years from
    the date of this Order, the thermal discharge
    to Coffeen Lake from Coffeen Station shall not
    result in a temperature measured at the
    outside
    30-83

    —8—
    edge of the mixing zone
    in
    Coffece rake ex-
    ceeding 98°F during more
    than
    8.2 percent of
    the hours in the twelve
    month
    period
    ending
    with any month, and
    in any event shall
    at no
    time exceed 108°F.
    2. If at the end of the three
    year
    p-;-riod rioted
    in (1) above, Central
    Illinois
    Puhlic Service
    presents evidence which
    convinces the Board
    that Coffeen Lake meets the crite; i-s of Rule
    203(i) (10), the interim limits no
    ~it
    in (1)
    above shall become permanent spee i ic
    thermal
    standards for Coffeen Lake..
    I, Christan L. Moffett, Clerk of
    the Illinois
    Pollution
    Control Board, hereby certify the above Opinion
    and Order were
    adopte~on
    the
    ~
    day of~~L~
    1978 by a vote
    ~--
    Christan b.-
    Mdf~~t, Clerk
    Illinois Pollution Control Board
    30—84