ILLINOIS POLLUTION CONTROL
BOARD
September 7,
1978
CENTRAL
ILLINOIS PUBLIC SERVICE
)
COMPANY,
)
Petitioner,
v.
)
PCB 78—78
)
ENVIRONMENTAL PROTECTION AGENCY,
)
Respondent.
OPINION
AND
ORDER OF THE BOARD (by Mr.
Goodman):
This matter is before the Board on a motion by Central
Illinois Public Service Company (CIPS) for relief from a Board
order in PCB 77-145 entered September 1, 1977. The Board construed
the motion as a new petition for variance from a Board order and
docketed the petition as PCB 78-78. Hearing was waived in this
matter, and the Board has received no public comment.
Condition 3 of the order entered in PCB 77-145 required CIPS
to submit an operating permit application to the Illinois Environ-
mental Protection Agency (Agency) on or before November 3, 1977.
In the interim, however, a coal strike prevented CIPS from stack
testing unit one under full load conditions with Illinois coal.
In addition, there were periods of time when the unit was out
of repair, or when severe weather intervened, or when the repre-
sentative coal stored for the purposes of the test was frozen and
could not be retrieved. Newton finally scheduled stack tests for
the unit during the week of June 12, 1978.
The Agency agrees that CIPS made some honest attempts to do
the stack tests but due to the circumstances was unable to do the
tests on schedule. The Agency therefore recommends that the variance
be granted subject to certain conditions. The Board finds that
it would be arbitrary and unreasonable not to grant CIPS a delay
in compliance with condition 3 of the September 1, 1977 order in
PCB 77-145 since CIPS was thwarted in good faith attempts to comply
with the Board order
by
extraneous circumstances.
The Board will
therefore grant CIPS until September 30, 1978 to comply with the
condition 3, in the event it has not already done so.
31—377
—2—
This Opinion constitutes the findings of fact
and
the conclu-
sions of the Board in this matter.
ORDER
It is the Order of the Pollution Control Board that:
1. Central Illinois Public Service Company be granted
a variance from condition 3 of the Board order
entered September 1, 1977 in PCB 77—145 until September 30,
1978 subject to the following conditions:
a. Stack tests shall be conducted at full load, and
an application for an operating permit shall be
filed with the Agency by CIPS prior to the termination
of this variance.
b. Within 45 days of the adoption of this Order, the
Central Illinois Public Service Company shall execute
and forward to John D. Williams, Technical Advisor,
Illinois Environmental Protection Agency, 2200
Churchill Road, Springfield, Illinois 62706 a
Certification of Acceptance and Agreement to
be bound to all terms and conditions of this Order.
The 45 day period shall be held in abeyance during
any period this matter is being appealed. The form
of said certification shall be as follows:
CERTIFICATION
I, (We), _______________________________ having
read and fully understanding the Order of the
Illinois Pollution Control Board in PCB 78—78
hereby accept said Order and agree to be bound by
all the terms and conditions thereof.
SIGNED ___________________________
TITLE
__________________________
DATE______________________________
2. This variance shall terminate sooner upon compliance with
Section la. above.
I, Christan L. Moffett, Clerk of the Illinois Pollution Control
Board, hereby certify the above Opinion and Order was adopt~don
the ¶k~
day of
_______________,
1978 by a vote of ~(-O
Illinois Polluti. Control Board
31—378