ILLINOIS POLLUTION CONTROL BOARD
    August
    3,
    1978
    IN THE
    MATTER
    OF:
    )
    )
    PROPOSED
    AMENDMENT
    OF THE
    )
    R76-16
    NOISE REGULATIONS,
    RULE
    209(f),
    )
    BLASTING NOISE
    )
    ORDER OF THE BOARD
    (by Mr. Goodman):
    The Board hereby proposes
    to adopt the following amendment
    to Rule 209(f)
    of the Noise Regulations, Chapter
    8 of the Board’s
    Rules and Regulations.
    This proposed amendment shall be subject
    to a 60-day public comment period.
    PROPOSED FINAL DRAFT ORDER
    Rule 209: Compliance Dates for Part
    2
    (f)
    Every owner or operator of Class C land now or
    hereafter used as specified by SLUCM Codes 852
    and 854 shall have
    ree—yea-~e~-the-e??ee~—
    ~
    to and including
    January
    1,
    1980,
    to bring the sound from neces-
    sary explosive blasting activities in compli-
    ance with Rule 206, provided that such blasting
    activities are conducted between 8:00 a.m. and
    5:00 p.m. local time,
    at specified hours pre-
    viously announced to the local public, and that
    the following standard practices are employed:
    1.
    Accurate drilling shall be maintained, and
    setbacks shall be used to determine burden
    on the following shot;
    2.
    Drill patterns having optimum spacing-to-
    burden ratios shall be used;
    3.
    Proper stemming height and stemming
    materials shall be used;
    4.
    The use of uncovered explosives,
    such as
    detonating cord,
    shall be avoided;
    5.
    A longer delay interval between rows than
    between holes in
    a row shall be
    used
    31—221

    —2—
    7.
    The rate of blast progression along the
    face shall be kept subsonic, preferably
    less than 500 feet per second,
    to elimi-
    nate beam formation;
    8.
    Weather conditions shall be considered,
    and blasting shall be avoided under in-
    clement conditions or early
    in the
    morning or late in the afternoon when
    temperature inversions may be present
    9.
    The blast shall proceed in the proper
    sequence;
    10.
    The maximum peak particle velocity of the
    ground motion in any plane shall not ex-
    ceed
    1 inch per second at the immediate
    location of any dwelling, public building,
    schobi,
    church,
    or commercial or institu-
    tional building;
    and
    11.
    Airblast shall be controlled such that it
    does not exceed 128 decibels linear-peak
    for the surface mining of coal and for
    stone quarrying,
    as measured at any dwell-
    ing,
    public building,
    school,
    church,
    or
    commercial or institutional building.
    I, Christan L. Moffett, Clerk of the Illinois Pollution
    Control Board, hereby certify the above Order was adopted on
    the
    ~
    day of
    ~
    ,
    1978 by a vote of
    ~
    Christan L. Moff’~, Clerk
    Illinois Pollution Control Board
    6.
    Long delays between holes shall be avoided
    to prevent unburdening holes
    31—222

    Back to top