ILLINOIS POLLUTION CONTROL BOARD
July 20, 1978
ILLINOIS POWER
COMP~ANY,
)
(BALDWIN STATION),
)
)
Petitioner,
)
V.
)
PCB 75—109
)
PCB
78—189
ENVIRONMENTAL PROTECTION
)
CONSOLIDATED
AGENCY,
)
Respondent.
ORDER
OF
THE
BOARD
(by
Mr.
Goodman):
On June 30,
1978
Petitioner
filed
a
“Motion
to
Amend
Order”
in PCB 75—109.
The Board will treat this motion as a Petition
for Variance and assign it PCB 78-189.
The Board will incorporate the record of PCB 75-109 into
this proceeding; however, the Board will require that Petitioner
within 45 days specifically request or waive a hearing in accord-
ance with Procedural Rule 401(b).
Failure to do so shall subject
the Petition to dismissal for inadequacy.
IT
IS
SO
ORDERED.
I, Christan L. Moffett, Clerk of the Illinois Pollution
Control Board,
hereb
certify the above Order wa; adopted on
the~~~_dayof
,
1978 by a vote of
~
Illinois Pollution
ntrol Board
31-67