ILLINOIS POLLUTION CONTROL BOARD
    November
    16, 1978
    IN THE MATTER OF:
    PROPOSED DETERMINATION OF
    )
    PCB 78-98
    NO SIGNIFICANT ECOLOGICAL
    DAMAGE FOR THE DRESDEN
    GENERATING STATION
    INTERIM ORDER OF THE BOARD
    (by Mr. Dumelle):
    On April
    4,
    1978 Commonwealth Edison Company filed a
    Petition pursuant to Rule 203(i) (5)
    of Chapter
    3: Water Pollution
    of the Board’s Rules and Regulations.
    A report was attached in
    support of the Petition.
    A hearing was held on August 15,
    1978 at
    the Board’s Chicago office.
    The record does not contain any theoretical plume studies
    either for all four seasons
    for typical and worst case condi-
    tions or which identify isotherms at 3°Fahrenheit intervals
    down to ambient temperature indicating three dimensional effects.
    There
    is also no assessment of the impact on other animal life
    (wildfowl, amphibians,
    etc.)
    in the area or on recreation.
    This
    information is required by Procedural Rules 602(c) (2)
    and
    (3),
    602(d) (2)
    ,
    and 602(d) (3)
    (a)
    Commonwealth Edison Company
    is hereby ordered to supply the
    information listed above within 180 days of the date of this
    Order.
    IT
    IS SO ORDERED.
    I, Christan L. Moffett, Clerk of the Illinois Pollution
    Control ~oard,
    hereby certify the above Order was adopted on
    the
    /~1’~~
    day of
    ~
    ,
    1978 by a vote of
    Illinois Pollut
    32—99

    Back to top