ILLINOIS POLLUTION CONTROL BOARD
    August 23,
    1979
    ILLINOIS ENVIRONMENTAL
    )
    PROTECTION AGENCY,
    )
    Complainant,
    v.
    )
    PCB 78-30
    ARTHUR LIGHT,
    Respondent.
    ORDER OF THE BOARD
    (by Mr. Werner):
    On August
    6, 1979, Mr. Andrew A. Rathsack, P.E.,
    sent the Board
    a letter indicating that Mr. Arthur Light had retained his engineer-
    ing firm
    (Environmental Engineering,
    Inc.)
    to assist Mr. Light in
    obtaining an Operating Permit for a landfill near Pottstown,
    Illinois.
    In his letter, Mr. Rathsack stated that, although they are
    actively working toward getting an Operating Permit,
    it will be
    impossible for them to do so in the 120 day time period allotted in
    the Board’s Order of April 12,
    1979.
    Therefore, the letter requested
    a time extension of
    90 days to obtain the requisite Operating Permit
    from the Illinois Environmental Protection Agency
    (“Agency”).
    The Board liereby construes this letter as a Petition for a
    Variance from a Board Order and hereby dockets this variance as case
    number P03 79-172 and sets it for Agency recommendation.
    IT
    IS SO ORDERED.
    I, Christan L.
    Moffett, Clerk of the Illinois Pollution
    ControJ..~~rd,hereb
    certif
    that the above Order was ad
    ted on
    the
    ~6”
    day of
    _______________,
    1979 by a vote of
    ________
    Illinois Pollution
    rd
    Board
    35—
    189