TLI,tNOIS POLLUTION CONTROL BOARD
July
26,
1979
ALLIED CHEMICAL CORPORATION,
)
Petitioner,
v.
)
PCB 79—149
ENVIRONMENTAL PROTECTION
AGENCY,
Respondent.
ORDER OF THE BOARD
(by Mr.
Dumelle):
On July 25,
1979 Petitioner requested an extension of the
variance granted by the Board in PCB 77—203 on June
22,
1978.
The Petition is deficient
in two respects.
First,
it fails
to request incorporation of the record, opinion and order
in
PCB 77—203 as required by Procedural
Rule 402(a).
Second,
it
fails
to specifically request or waive a hearing as required
by Procedural Rule 401(b).
If these deficiencies are not
corrected within 45 days of the date of this Order,
this matter
will
he subject to dismissal.
The statutory 90 day decision
period shall run from the date an amended Petition is filed.
IT
IS SO ORDERED.
I,
Christan L.
Tloffett, Clerk of the Illinois Pollution
Control
Board,
hereby certify the above Order was adopted on
the
~
day of
_________________
,
1979 by a vote of
~
—
/,~
Christan
L.
Moffett,
Cre’rk
Illinois Pollution Control Board