ILLINOIS POLLUTION CONTROL BOARD
July 12, 1979
CITY OF CHICAGO,
(Roseland Pumping Station),
)
Petitioner,
v.
)
PCB 79—140
ENVIRONMENTAL PROTECTION AGENCY,
)
Respondent.
ORDER OF THE BOARD
(by Mr. Dumelle):
On July
9,
1979 Petitioner requested an extension of
the variance granted in City of Chicago
v.
EPA, PCB 78—106,
September
7,
1978,
33 PCB 35.
The Petition is deficient in
several respects.
First,
it fails to state whether the record
in PCB 78-106 should be incorporated into this record as
required by Procedural
Rule 402(a).
Second,
it fails to state
the quantity of emissions which will result from conversion
as required by Procedural Rule 401(a)(4).
Third,
it fails to
give
a detailed description of Petitioner’s compliance program
as required by Procedural
Rule 401(a)(6).
Fourth,
it fails
to specifically request or waive a hearing as required by
Procedural
Rule 401(b).
If these deficiencies are not corrected
within 45 days of the date of this Order, this matter will be
subject to dismissal.
The statutory
90 day decision period
shall run from the date an amended petition is filed.
IT IS SO ORDERED.
I, Christan L.
Moffett, Clerk of the Illinois Pollution
Control
Board, hereby certify the abo e Order was adopted on
the
________________
day of
__________________,
1979 by
a vote of
______________________
Board
(IC)
Illinois Pollution
35—67