ILLINOIS POLLUTION CONTROL BOARD
May
14,
1981
CITY OF WOODSTOCK,
Petitioner,
V.
)
PCB 81—45
ILLINOIS ENVIRONMENTAL PROTECTION
)
AGENCY,
Respondent.
OPINION
AND
ORDER OF THE BOARD
(by J.D.
Dumelle):
On March 23,
1981 the City of Woodstock (City)
filed a
petition for variance from Rule 1201 of Chapter 3:
Water
Pollution.
On April
9,
1981 the City waived hearing, and on
April
24, 1981 the Illinois Environmental Protection Agency
(Agency)
filed
a recommendation that the variance be granted
subject to certain conditions.
No hearing was held.
The City owns and operates the Northside Sewer Treatment
Plant which is an activated sludge treatment plant serving
approximately 10,000 persons with a design average flow of
3.5 million gallons per day.
It is thus a Group A facility
requiring
a Class
1 operator.
The present operator, Mr. Gaylord
Stebbins,
is presently a Class
2 operator who is currently
taking college courses in mathematics in order to take the
Class
1 operator’s certification examination.
Mr. Stebbins
will allegedly complete his coursework by June
1,
1981 and
is scheduled to take his certification exam on July
7,
1981.
The Board
finds that Mr. Stebbins has done an adequate
job of operating the plant and that it would therefore impose
an arbitrary and unreasonable hardship upon the City to immediately
hire a Class
1 operator.
Normally, in a case such as this,
the Board would not hesitate
to grant variance.
There is,
however, one troubling aspect of
this request.
The City filed for a similar variance on February
6,
1979
which was dismissed by the Board on April
26,
1979 for failure
to amend the petition to cure procedural defects.
This delay has
not been explained and the Board must note that the City has been
dilatory in achieving compliance with Rule 1201.
In the future,
the City should be more diligent in complying with Board rules.
However, the Board will grant the variance.
LL
1
—
L
33
—2—
This Opinion constitutes the Board’s findings of fact
and conclusions of
law in this matter.
ORDER
The City of Woodstock
is hereby granted a variance from
Rule 1201 of Chapter
3 until October
1,
1981,
or until Mr.
Stebbins becomes properly certified, whichever occurs first,
subject to the following conditions:
1.
In the event Mr.
Stebbins’
employment terminates
prior to October
1,
1981, the variance shall expire
at the time of termination and the City shall immediately
obtain the services of a Class
1 operator.
2.
The City shall operate its wastewater treatment plant
utilizing the best practicable operation and maintenance
practices.
3.
Mr. Stebbins
shall take the Class
1 examination
on or before July
7,
1981.
4.
Within 45 days of the date of this Order, the City
shall execute and forward to the Illinois Environmental
Protection Agency, Division of Water Pollution Control,
Compliance Assurance Section,
2200 Churchill Road,
Springfield,
Illinois 62706,
a Certification of
Acceptance and Agreement
to be bound by all conditions
of this Variance.
This forty—five day period shall
be stayed if the City seeks judicial review of
this Variance.
The form of said Certification shall
be as follows:
CERTIFICATIOt’1
I,
________________________________________,
having read
the Order of the Illinois Pollution Control Board
in PCB 81—45,
dated
,
understand and accept
the Order and agree to be bound by all
of its terms and conditions.
_____________________________________
Petitioner
_____________________________________,
Authorized Agent
______________________________________
Title
_______________________________________,
Date
IT
IS
SO
ORDERED.
4 1—
t~
3
!~
I,
Chri~•~t~n
L.
M~~tu~t~
(‘)~rk
of
the
Illinois
Pollution
Control
Bo~:cd~hr~y
~t::?lly
thdt
th~
above
Opinion
and
Order
w~’~
~do~
tt
~I on
U
/
1
_________
1981
by
a
vote
of
~
Christan
L.
Moffe~tq Clerk
Illinois Pollutiontontrol
Board
/41~35