1. (PONTIAC FACILITY),
      2. I? IS SO ORDERED,

ILLINOIS
POLLUTION
CONTROL
BOARD
Decernber 17,
1981
ILLINOIS DEPAR~ENT
OF CORRECTIONS
(PONTIAC FACILITY),
Petitioner,
v~.
)
PCB
81—194
ILLINOIS
ENVIRONMENTAL PROTECTION
AGENCY,
Respondent~
ORDER OF THE
BOARD
(by
I
*
Goodman)
Petitioner in this
proceeding
is requesting
a variance from
Rule 604 of the Board’s
Chapter
3:
Water Pollution in
order to
obtain a
permit
to connect
to the
city
of Pontiac
(Pontiac)
sewage system.
Petitioner
is therefore ordered to
join Pontiac.
a necessary party, in
this matter.
The ninety (90)
day decision
period will, begin the
day proof of service on Pontiac
is filed
with the Board,
Thereafter!
the
Illinois
Environmental
Protection
Agency is directed to
address
in its Recommendation
Petitioners
need for a Variax~ce,in
light of its having had an
existing sewage
connection prior to
the imposition of
Restricted Status
on Pontiac.
I? IS SO ORDERED,
I, chriatan L.
Moffett,
Clerk of the Illinois
Pollution
Control
Bard,
hereby
~ertify that the
above
Order was
adopted
on the
/1
day of
~
1981 by a vote of
~
Christan
L~
Mo
Clerk
i~i
inois Polluti n
Control Board
44—259

Back to top