ILLINOIS POLLUTION CONTROL BOARD
    July
    1,
    1982
    BEKER INDUSTRIES CORPORATION1
    )
    Petitioner,
    )
    v.
    )
    PCB 80—224
    ILLINOIS ENVIRONMENTAL PROTECTION AGENCY,
    )
    Respondent.
    ORDER OF THE BOARD
    (by
    I.
    Goodman):
    On June 10,
    1982 the Board modified its April
    29,
    1982
    Order in this matter.
    Petitioner had requested that the Board
    order which required installation of monitoring wells at the
    site prior to the defluorination facility being activated be
    deleted.
    In its June
    1~
    1982 motion Petitioner had represented
    that the defluorination unit began operation in February 1980
    after negotiations with the Agency that same month.
    The
    Illinois Environmental Protection AgencyVs (Agency)
    response
    concurred with Petitioners
    motion, but it included an assurance
    that March 11, 1981 grab sample taken from the cooling pond
    established which materials were present in the cooling pond
    prior to start—up of the defluorination unit.
    This would be
    improbable
    if the defluorination unit had been operating since
    February,
    1980.
    After reviewing the concurring and dissenting opinions in
    this matter, Petitioner realized that the 1980 dates were in
    error and informed the Board by letter on June 22,
    1982 that the
    defluorination unit was operating
    in February 1981 rather than
    1980.
    The Board acknowledges the correction,
    The language of
    the April 29,
    1982 Opinion remains unchanged except as modified
    on June 10, 1982.
    IT IS SO ORDERED.
    I,
    Christan L.
    Moffett,
    Clerk of the Illinois Pollution
    Control Board, hereby certify that the above Order was adopted
    on the
    )~day of/~~
    ,
    1982 by a vote of ~
    ~-,
    /~4~/~
    ~
    Cnristan L. Moffett, ci~~
    Illinois Pollution Control Board