ILLINOIS POLLUTION CONTROL BOARD
    December 2,
    1982
    ACME BARREL COMPANY,
    )
    Petitioner,
    v.
    )
    PCB 82—135
    ILLINOIS ENVIRONMENTAL PROTECTION
    )
    AGENCY,
    Respondent.
    ORDER OF THE BOARD
    (by
    I.
    G. Goodman):
    On November 16,
    1982 Acme Barrel Company
    (Acme)
    filed
    a
    petition for variance,
    Due to potential public interest and
    because a revision to the State Implementation Plan, under the
    Clean Air Act, may be needed should variance be granted, on its
    own motion the Board orders hearing set in the matter.
    Since
    the petition received indicates that construction modifications
    have already begun, hearing is to be set as soon as possible.
    Prior to hearing,
    the Petitioner is ordered to answer the
    following:
    1)
    For how long is variance requested?
    2)
    When the construction program is completed, will
    Petitioner be in compliance with Board regulations?
    3)
    What type of pollutants are emitted from Petitioner’s
    facility?
    4)
    In what amounts are these pollutants estimated
    to
    be emitted now,
    during construction, and after con-
    struction?
    The answers should be submitted to the Board and the Illinois
    Environmental Protection Agency.
    IT IS SO ORDERED.
    I,
    Christan
    L. Moffett, Clerk of the Illinois Pollution
    Control Boa~d,hereby certify that the above Order was adopted
    on the
    ok~
    day of
    ~
    ,
    1982 by a vote of
    ~
    L(~J~~)
    (~C~1~i
    Christan
    L. Moffet~/1g~’erk
    Illinois Pollution eantrol Board
    50-91

    Back to top