ILLINOIS POLLUTION CONTROL BOARD
    June 16, 1983
    REVERE COPPER AND BRASS,
    INCORPORATED,
    )
    Petitioner,
    v.
    )
    PCB 80—117
    ENVIRONMENTAL PROTECTION AGENCY,
    Respondent.
    INTERIM ORDER OF THE BOARD
    (by D. Anderson):
    This NPDES permit appeal involves application of the
    water quality standards or anti-dilution rule to ponds
    formed by damming a waterway adjacent to the plant property
    south of Clinton
    (35 Ill.
    Adin.
    Code 302 or 304.102).
    Petitioner’s witness testified that the drainage area upstream
    of the plant was 5000 acres and that the average flow was
    384,500 gallons per day
    (R.
    22,
    24).
    However, the topographi-
    cal map shows a drainage area of less than 640 acres
    (Ex.
    7).
    Furthermore,
    the average flow expected from 5000 acres would
    be about 5.6 MGD, based on
    30 inches annual rainfall and 50
    runoff.
    The Board asks the parties to supplement the record
    with additional information on the size of the watershed.
    The Board
    asks
    the parties to pLovide current infor-
    mation on Petitioner’s legal status and the ownership of the
    facility in question.
    Petitioner is requested to provide the above information
    to the Board within 21 days from the date of this Order.
    IT IS SO
    ORDERED.
    I, Christan L. Moffett, Clerk of the Illinois Pollution
    Control Board, hereby certify that the above Order was adopted
    on the
    ~
    day ~
    ,
    1983 by a vote of
    ~
    c’
    I,
    /~
    ~___~1’V
    Lk~*t.
    (fl ~
    Christan L.
    Mof’f(e~~
    Clerk
    Illinois Pollutiô~iControl Board
    52-355