Maple Lawn Homes
(MPL) has requested expedited consideration
of this petition, filed March 14 as amended April
5,
1983.
The
Agency filed its Recommendation in support of grant of variance
with conditions on May
2,
1983.
Neither the petition nor the Recommendation specificaliy
advise the Board a)
when “in the fall” MPL would anticipate the
additional housing units
to be ready for occupancy based on a
May construction start,
and b) when Eureka’s Phase A sewage
treatment plant
(STP)
expansion work and the subsequent flow
monitoring study are anticipated to be completed, based on a
“summer,
1983” construction start
(Rec.
p.
5), and c) when,
assuming Phase B STP work
is concluded to be necessary, design
and construction would be projected to be completed, based on
the Agency’s projection that design work could begin in November,
1983
(Rec.
p.
5),
and Petitioners’ assertion that construction
would begin in summer,
1984
(Pet.
p.
3—4).
Petitioners are requested to
file
an amendment to their
petition (supported by affidavit)
supplying this information.
The Board will expedite its decision
in this matter,
currently
due for decision June
30,
1983, upon receipt of the requested
information.
Petitioners would
•be advised to submit their
amendment on or before May 13,
1983 if they wish this petition
to be considered by the Board at its May 19,
1983 meeting.
IT IS SO ORDERED.
I, Christan L.
Moffett,
Clerk of the Illinois Pollution
Control Board, hereby certify that the above Order was adopted
on the
~
1
day of ~
,
1983
by
a vote of
_____—
(I
—~
L~’
~
~~~___
Christan L. Moffe~,t/Clerk
Illinois Pollution Control Board
52-151