ILLINOIS POLLUTION CONTROL BOARD
    October 14,
    1982
    IN THE MATTER OF:
    )
    RACT II RULES,
    )
    R80—5
    CHAPTER
    2:
    AIR POLLUTION
    )
    Proposed Rule.
    Second Notice.
    ORDER OF THE BOARD
    (by I.
    G. Goodman):
    The Second Notice Order of the Board issued on October 5,
    1982 is hereby amended:
    Rule 104(h) shall read:
    (h)
    RACT II Compliance Plan Submission and Approval.
    (1)
    The owner or operator of an emission source
    subject
    to Rule 205(j)(1) shall
    submit to the Agency a com-
    pliance plan, including a project completion schedule
    where applicable, no later than:
    Days After
    Rule
    Promulgation
    (A)
    Rules
    205(o) (3),
    205(s)
    and 205(t)
    90
    (B)
    Rules 205(u)(l)(A)
    and
    (B)
    90
    (C)
    Rule 205(n)(l)(J)
    and (K)
    210
    (2)
    The owner or operator of an emission source subject to
    Rule 205(j)(2)
    shall submit to the Agency a compliance
    plan,
    including a project completion schedule where
    applicable, no later than December 31,
    1986.
    (3)
    The owner or operator of an emission source subject
    to Rule 205(j)(3)
    shall submit
    a compliance plan1
    including a project completion schedule within
    90 days
    after the date of redesignation, but in no case later
    than December 31, 1986.
    (4)
    Unless the submitted compliance plan or schedule is
    disapproved by the Agency,
    the owner or operator of
    a facility or emission ~ource subject to the rules
    specified in Rule 205(h)(1),
    (2), or
    (3) may operate
    the emission source according to the plan and schedule
    as submitted.
    49-191

    2
    (5)
    The plan and schedule shall meet the requirements of
    Rule 104(b) including specific interim dates as
    reg.uired
    in Rule 104(b)(2).
    Rule 205(m)(5)
    shall read:
    (5)
    Coating Lines Subject to Rule 205(n)(l)(K)(ii)
    The owner or operator of coating lines subject to
    Rule 205(n)(1)(K)(ii)
    may in lieu of compliance
    with
    Rule 205(j)(l) demonstrate compliance through the use
    of a low solvent coating technology by taking the fol-
    lowing actions:
    (A)
    Submit to the Agency a Compliance Plan, including
    a project completion schedule, that meets the
    requirements of Rule 104(h) (1) within 210 days
    after the effective date of this rule; and
    (B)
    Meet the following increments of progress:
    (i)
    Submit to the Agency by July
    1,
    1984 and
    every six months thereafter a report des-
    cribing in detail the progress made in the
    development, application testing, product
    quality, customer acceptance, and FDA or
    government agency approval of the low sol-
    vent coating technology
    (ii)
    Initiate process modifications to allow
    the use of low solvent coatings as soon
    as coatings meeting Board requirements
    become commercially available for produc-
    tion use; and
    (iii)
    Achieve final compliance as expeditiously
    as possible but no later than December 31,
    1986.
    Rule 205(m)(6)(C)
    shall read:
    (C)
    Agree to install one of the control alterna-
    tives specified in Rule 205(s)(l)(C) by June
    31,
    1986 if the specified low—solvent ink
    strategy fails
    to achieve scheduled reduc-
    tions by December 31,
    1985.
    49-192

    3
    IT IS SO ORDERED.
    I,
    christan L. Moffett, Clerk of the Illinois Pollution
    Control Bo~d,hereby ce tify that the above Order was adppted
    on the
    /~/“
    day of
    _____________,
    1982 by a vote of
    ~
    c&L~
    c~1fl
    o~~b~LL~
    Chrjstan L.
    Mof ett/ ~j4~k
    Illinois Pollution Co’i1~WolBoard
    49-193