ILLINOIS POT LUTION C ~OL 3O~RD
5eptcmbc~ ~ 1 82
ALTON
WATER CO
,
PCB
82~13
ILLINOIS
ENVIRONMENTAL ~R
ORDER
OF
THE BOARD (by J~ c~etsor
On
August 23, 1982 Alto ~iled u “mction to
reconsider or, in
the alternative,
to correct eler cal error” in the
Board~sOpinion
and Order
of August 18, 1982. Thc Board had granted a
variance to
“terminate
September 1, 1985 or upon any earlier final
decision in
R82—3”,
based upon the Agen y A ~mrrendation Alton
asserts that
the variance ten~is ins fficic~
t, r~the event of an
unfavorable
decision
in R82—3, to sI~ieldi: froit~ erforcement
while it is in
the process of constructing facilit~ces to treat the wastes from
its water
purification plant~. tLiles~ the term is extended,
Alton
notes that it immediately
‘~
uld ~gain be required to
seek a
variance”. Two altczr t a v~r
~ ‘~i~s re suggested
for the
Board~s
considerati
r
n
ci
~h
jre~l ~o by the
Agency.
The Board
will modify its order to embody the
agreed
replacement
variance tern, as a~
tut
~uree year maximum
duration
remains
unchanged, and b) in ti’c. even~of an unfavorable
decision
in R82~3,
construction tine for tI’~.
t~eatrient
facilities would be
about 20
months,
Paragraph
1(a) of the Board~sOrder of August
18, 1982 is
stricken, to
be replaced qith:
“a.
This variance ~ha I terrinate ~eptember
1,
1985 or upon
the earlier date of eIther (1) a final
Board decision
in R82—3 fa~orableto Petitioner or
(2) Agency
issuance (follo~ingprompt application)
of
an
operating or NPDES ?ermit for treatment facilities
disposing
of wastes from the Petitroner~ water
treatment
plants”
IT IS
SO
ORDERED.
I,
Christan
L~Moffett Clerk of the Illinois
Pollution
Control ~oard,
hereby cc tify that the above Order
was adop ed on
the ~1~’
day of
~982 by
a vote of 0
Christan L. Moff
Clerk
——
Illinois Pollution
Control Board