    My reason for concurring in this provisional variance
    is that
    I believe it
    is contrary to the intent of the General
    Assembly.
    Provisional variances,
    I believe, were designed to cover
    fast breaking situations
    of an unanticipated nature.
    Here
    we have a
    massive
    diversion of from 40
    -
    80 million gallons
    of wastewater per day for two days with only primary treatment.
    The MSDGC contract for this project was drawn up back in 1977.
    A related variance,
    PCB 83—72, was filed with the Board
    without using the provisional variance mechanism and decided
    on July 14, 1983.
    The instant case should have been filed
    in the same fashion to allow for public scrutiny.
    Provisional variances bypass public notice and opportu-
    nity for hearing.
    They should not be used for situations
    such as this where plans were drawn up in 1977 or earlier.
    I,
    Christan L. Moffett, C~k
    of the
    Illinois Pollution
    Control Board, hereby certify that the above Concurring
    Opinion was
    filed on the
    ~
    day of)~~E_,
    1983.
    QL~LG~LJ1Y)
    ~
    Christan L. Moffe~flClerk
    Illinois Pollution control Board
    ~pectful).~zja~,
    ~acob D,
    Dumelle, Chairman
    53-263

    Back to top