ILLINOIS POLLUTION CONTROL BOARD
January 10,
1985
IN THE MATTER OF:
)
SITE-SPECIFIC SO
,
PARTICULATE
)
R84—49
AND OPACITY LIMI~ATIONSFOR
)
AMERICAN BRICK COMPANY
)
ORDER OF THE BOARI
(by J.
D,
Dumelle):
This matter cores before the Board upon a
December 26,
1984
petition for site~~ecificemission limitation
for sulfur
dioxide
and particulate mafter for American Brick Company’s chicago—Dolton
plant.
That petitic~ndoes not include the
“language of the
pro-
posed regulation” a~required by 35
Ill. Adm.
Code 102.120(a)
or
“a petition signed by at least 200 persons”
as
required by
35
Iii, Adm, Code 02.121(a).
However, the
petition otherwise
complies with the filing requirements.
The Board will docket the proposal and will
waive the
200
signature requirement, but
will not schedule hearings to
consideT
the petition until proposed language is filed.
IT
IS SO ORDERED.
I, Dorothy
M.
Gunn, Clerk
of the Illinois Pollution Control
Board, hereby certi
that the above
Order
was adopted on the
/~7~
day of
~.
,
1985
by a
vote of 5~
(7~7
~2~i
~
Dorothy M. Gu~n,Clerk
Illinois Pollution Control Board
62-373