ILLINOIS POLLUTION CONTROL BOARD
    February 20,
    1985
    ILLINOIS ENVIRONMENTAL
    )
    PROTECTION AGENCY,
    )
    )
    Complainant,
    v.
    )
    PCB 81—144
    M~RATHON
    PETROLEUM COMPANY,
    )
    a~Ohio corporation,
    )
    Respondents
    ORDER OF THE BOARD
    (by B. Forcade):
    On July 25,
    1983,
    the parties
    in this case filed a
    Stipulation to Certain Facts and Agreement for Conduct of
    Engineering Study, wherein the Agency agreed
    to delay prosec~it~.o;~
    of this action pending the outcome of an engineering study
    performed by an independent engineering firm retained by
    Marathon.
    By the terms of the stipulation,
    the study was to be
    completed “on
    (
    before March
    31,
    1984,
    or within six months
    after Board ap~ )val of this stipulation,
    which ever occurs
    first.”
    There
    ~s been no activity in this matter since the
    filing of this
    tipu.ation.
    If
    no hearing
    is scheduled within 30
    days and held ~thin
    60 days of the date of this order,
    this case
    will be subject
    to dismissal.
    IT IS SO
    ORDERED.
    I, Dorothy M. Gunn, Clerk of the Illinois Pollution Control
    Board1
    hereby certify that
    the
    above Order was adopted on
    the
    ~(~
    day of
    ---~,~
    ,
    1985,
    b~’a vote
    ofc—C)_.
    /
    Dorothy M. Gunn, Clerk
    Illinois Pollution Control ~rard
    63~O3