:~x~LINOis
POLLUTION CONTROL BOARD
September 20,
1985
IN THE MATTER
OF
JOINT PETITiON CF THE VILLAGE
)
PCB 85—33
OF
HARTFORD AND THE ILLINOIS
ENVIRONMENTAL PRO~IECTIONAGENCY
FOR EXCEPTION TO THE COMBINED
SEV~ER OVERFLOW
;~CULATIONS
INTERIM
ORDEi~
THE
BOARD (by B.
Forcade):
On March
l98E~the Village of Hartford (“Village”)
and
the Illinois
ronmental Protection Agency (“Agency”)
filed
for
an exception
~
il..
Adm.
Code 306.305
(a)
and
(b)
of
the
Board’s combint~ee~eroverflow regulations.
By Order of March
22,
1985,
the E~d
ncfted
a deficiency
in the petition, per-
taining
to information required by 35
Ill. Mm.
Code 306.363(d)
relating
to va~:lancesor enforcement status
and requested this
matter
be addressed at hearing.
In reviewing the presently
existing record,
the Board has been unable to find this
information.
Consequently, the Board will again request
information on prior variances and enforcement status relating to
the Village of Hartford,
Additionally, the Board will request
information on five other matters,
The ViLLage
of Hartford
or the Illinois Environmental
Protection Agency is ordered
to provide the Board, within 60 days
of
the date
of
~
Crdei:,
with the following information:
1.
A st:~~:~.as required by 35
Ill. Adm. Code
306
~isto whether
the Village has previously
been
~t~•d
any
variances or been subject
to any
enfo~~mer~i:
~t~tion.
2.
A
statecunt
on
the
present
status
of
the
ccood
River
Regional
~a~tewater
Treatment
project,
including
any
anticipa~cI
schedule
for
the Village
of
the Hartford
to
hook~u~~o ~tet
project.
3.
A statement of clarification as to what percentage of
the
f.Li~-st flush of
a one—year,
one—hour
storm would
be
captured
:~
the pumping
system proposed
by the Village
of Hartford and the Agency
in their draft order.
4.
A
discussion
of the present compliance status of
the
facili~:y:~e~.
does the facility qualify
for the
exempt~on
of
35
Iii. Adm~Code 304.301?
85-485
5.
A clearer statement
of
the
relief requested.
Is the
relief prospective only,
i.e.,
after
the ~ood River
Regional Treatment Project
is operational, or
is
it
presently needed?
6.
A statement that
the
time limitations of
35
Ill. Adm.
Code
306. 351 have been met?
IT
IS
SO ORDERED
I, Dorothy M~Gunn,
Cleri~ of
the Illinois Pollution Control
Board, hereby certify
tImt~,tue above Interim Order was adopted on
the
~
day of ________________________,
1985,
by a vote
of
7—&
.
4-
-,
1’’
~
/12,
~
Dorothy
M, ~unn, Clerk
Illinois Pollution Control Board