ILLINOIS
    POLLtJTiO~
    CONTROL BOARD
    September
    20,
    1985
    CITY OF STREATOR,
    Petitioner,
    v.
    PCB 84—181
    ILLINOIS ENVIRON~NTAL
    PROTECTION AGENCY,
    Respondent~
    ORDER OF THE BOARD
    (by L
    C~ Flemal)
    This matter comes before
    the
    Board
    on an August
    20 letter
    (which the Board construes as
    a motion
    for reconsideration) filed
    by the City of Streator
    (‘~Streator”). Streator requests the
    Board
    reconsider
    the compliance dates
    imposed on Petitioner
    through conditions
    2,
    3,
    and
    5 of the Board’s August
    1, 1985
    Order.
    The Board received
    the Agency’s response to Streator’s
    motion on September
    9,
    1985.
    Petitioner’s motion
    is granted.
    The dates specified
    in
    conditions
    2,
    3,
    and
    5 of the Board’s August
    1, 1985 Order
    are
    therefore revised
    to December
    3i~
    1985,
    December
    31,
    1986,
    and
    July
    1, 1988 respectively.
    J.D.
    Dumelle concurred~,
    IT
    IS SO ORDERED.
    I,
    Dorothy M. Gunn,
    Clerk of the Illinois Pollution Control
    Board,
    hereby certify that the~aboveOrder was adopted on
    the
    _______________
    day of
    ~
    ,
    1985, by
    a vote
    of
    _____________
    (/‘
    ~
    ~
    ~
    Dorothy
    M, Gunn,
    Clerk
    Illinois Pollution Control Board
    B~481

    Back to top