ILLINOIS
POLLtJTiO~
CONTROL BOARD
September
20,
1985
CITY OF STREATOR,
Petitioner,
v.
PCB 84—181
ILLINOIS ENVIRON~NTAL
PROTECTION AGENCY,
Respondent~
ORDER OF THE BOARD
(by L
C~ Flemal)
This matter comes before
the
Board
on an August
20 letter
(which the Board construes as
a motion
for reconsideration) filed
by the City of Streator
(‘~Streator”). Streator requests the
Board
reconsider
the compliance dates
imposed on Petitioner
through conditions
2,
3,
and
5 of the Board’s August
1, 1985
Order.
The Board received
the Agency’s response to Streator’s
motion on September
9,
1985.
Petitioner’s motion
is granted.
The dates specified
in
conditions
2,
3,
and
5 of the Board’s August
1, 1985 Order
are
therefore revised
to December
3i~
1985,
December
31,
1986,
and
July
1, 1988 respectively.
J.D.
Dumelle concurred~,
IT
IS SO ORDERED.
I,
Dorothy M. Gunn,
Clerk of the Illinois Pollution Control
Board,
hereby certify that the~aboveOrder was adopted on
the
_______________
day of
~
,
1985, by
a vote
of
_____________
(/‘
~
~
~
Dorothy
M, Gunn,
Clerk
Illinois Pollution Control Board
B~481