ILLINOIS POLLUTION CONTROL BOARD
May 9,
1986
ILLINOIS POWER COMPANY,
Petitioner,
v.
)
PCB 85-119
ILLINOIS ENVIRONMENTAL
)
PROTECTION AGENCY,
)
Respondent.
ORDER OF THE BOARD
(by B. Forcade):
On April
30,
1986,
both Illinois Power Company (“IPC”)
and
the Illinois Environmental Protection Agency (“Agency”)
filed
separate motions for reconsideration of the Board’s March
27,
1986, Opinion and Order
in this matter.
On May 5,
1986,
the
Agency filed
a response
to IPC’s motion
for reconsideration.
The
Board will grant reconsideration
of its March 27,
1986, Opinion
and Order
and will,
by this Order, establish
a briefing schedule
regarding the reconsideration of this proceeding.
The Agency’s motion,
among
other things,
asserts that
it
detrimentally relied on the Board’s November
7,
1985, denial
of
IPC’s motion for summary judgment and, consequently,
failed
to
address
these issues in
its
final brief.
As the Board ultimately
disposed of this case based
on issues raised
in IPC’s motion
for
summary judgment,
the Agency requests an opportunity
to present
legal argument and citations on these
issues.
By granting
reconsideration,
the Board provides such an opportunity.
Simultaneous briefs regarding reconsideration will
be
accepted through May 30,
1986.
Simultaneous reply briefs will be
accepted through June
10,
1986.
Parties may waive briefs and
rely on filings submitted
to date
in support
of reconsideration.
IT IS SO ORDERED.
I, Dorothy
M.
Gunn,
Clerk of the Illinois Pollution Control
Board, hereby certify that the above Order was adopted on
the
c7~~
day of
___________________,
1986, by
a vote
of
_________.
Dorothy M.
dunn,
Clerk
Illinois Pollution Control Board
69-375