ILLINOIS POLLUTION CONTROL BOARD
July 31, 1986
BLOOMINGTON AND NORMAL SANITARY
DISTRICT,
Petitioner,
V.
)
PCB 86—116
ILLINOIS ENVIRONMENTAL
PROTECTION AGENCY,
)
Respondent.
OPINION AND ORDER OF THE BOARD (by J. D. Dumelle):
This provisional variance request comes before the Board
upon a July 31, 1986 Recommendation of the Illinois Environmental
Protection Agency (Agency). The Agency recommends that a 45—day
provisional variance be granted to the Bloomington and Normal
Sanitary District from 35 Ill. Adm. Code 304.120(c) and 35 Ill.
Mm. Code 304.141(a) to allow the Petitioner to exceed its NPDES
Permit effluent biochemical oxygen demand (BOD) and total
suspended solids (TSS) limits during the time period that the
tertiary filters are bypassed while the filters are out of
service for structural inspection and repair. The Bloomington
and Normal Sanitary District was previously granted a provisional
variance in PCB 85—34 on March 22, 1985 to allow the rebuilding
and replacement of the tertiary filters’ media and to allow the
construction of some piping changes around the filters. (See:
Opinion and Order of March 22, 1985 in PCB 85—34, Bloomington—
Normal Sanitary District v. IEPA). However, the Petitioner has
not yet completely rebuilt and replaced the media of its tertiary
filters because of unanticipated wastewater treatment plant
operating constraints. (Rec. 1).
The Bloomington and Normal Sanitary District, which serves
approximately 85,000 residents in a 25 square mile area, owns and
operates three wastewater treatment facilities. Preliminary,
primary, and secondary treatment are provided by each of these
three wastewater facilities before their secondary effluents are
combined for tertiary treatment and disinfection. (Rec. 1).
Additionally, each facility has the capacity to disinfect its
secondary effluent individually if necessary. These three
facilities have a total design average flow of 16.0 million
gallons per day (rngd). Effluent from the Petitioner’s wastewater
treatment facilities is discharged to Sugar Creek, tributary to
Salt Creek, the Sanganion River, and the Illinois River.
(Pet.
71-451
—2—
The Petitioner’s NPDES Permit #1L0027731 provides that its
wastewater treatment facilities must meet tertiary effluent con-
centration limits of 10 milligrams per liter (mg/l) biochemical
oxygen demand and 12 mg/l total suspended solids as a monthly
average and 15 mg/l BOD and 18 mg/i TSS as a 7—day maximum
average plus associated loadings limits. In its letter to the
Agency dated July 24, 1986, the Petitioner submitted the fol-
lowing table which summarizes the relevant monitoring and past
secondary effluent data pertaining to actual flow, BOD, and total
suspended solids levels:
TABL.E I
BL~CK~IlNGTONAND NORMAL
SANITARY
DIS~IR1CT
12
nonth period
1984
1985
July ‘85
—
June
‘86
Aug. Sept.
Oct. Aug. Sept. Oct.
*plaflt
1
Flow(ngd)
5.4 3.9
6.5 8.8 6.1 7.6
8.1
BZID(mg/l)
31.8 27.4 23.8 17.3 26.6 17.0
23.4
SS(mg/1)
28.0 22.7 21.9 20.2 21.0 24.6
28.0
Plant 2
Flow(mgd)
0.5 1.7
2.0 1.6 1.9 1.7
2.1
&~D(mg/1)
15.8 8.8
7.4 4.9 8.3
9.3
13.0
SS(mg/1)
26.9 11.6
8.5 5.0 9.3 21.1
15.6
Plant
3
Flow(mgd)
5.9 7.0
6.3 5.9 6.0 7.2
7.4
9~D(mg/l)
8.4
9.6
7.6
5.1 8.1
6.1
6.6
SS(~r~g/1)
9.8 13.7 10.7 6.4 12.3 16.0
11.2
**c~j~Ø5j~~
Sample
Flow(mgd)
11.8 12.6 14.8 16.3 14.0 16.5
17.6
~D(mg/1)
19.4 15.0 14.7 11.7 16.2 11.4
15.1
SS(uvg/l)
18.9 16.0 15.3 13.7 15.7 20.5
19.5
***Fjnal Effluent
Flow(mgd)
11.9 12.5 14.8 16.2 14.0 16.6
17.6
a~D(mg/I)
11.0 10.0 10.0 8.0 10.0 6.0
10.2
~DT(mg/l)
N/A N/A N/A 5.4 7.9 5.3
7.6
SS(~g/1)
3.0 3.0
4.0 4.0 5.0 6.0
8.8
tPlant 1,2,3 secondary effluents
**Co(tposjte sample
based
upon weighted averaging for 3 plant
secondary
effluents.
***Final effluent is with tertiary filtration
BODT
~)D carbonaceous
+
nitrogenous demand
BOD carbonaceous demand
7 1-452
—3—
The Petitioner has requested effluent limitations of 25 mg/i
for both BOD and TSS as 30 day averages during the requested
45—day provisional variance period. Those limits will be
determined from a composite sample based upon the weighted
averaging for the three secondary plant effluents with no
tertiary filter treatment. From the past secondary effluent data
delineated in Table I, the Agency has concluded that the
“Petitioner should generally be able to meet the requested
effluent limits without the tertiary filters”. (Rec. 2).
In reference to the rationale for its provisional variance
request, the Petitioner stated in its letter to the Agency dated
July 24, 1986 that:
The tertiary filter has recently exhibited
structural problems with the media support floors. On a
preliminary basis, these problems have been identified
as loosening and failure of the media support anchor
system. The floor in one of the cells has “blown up”
during backwash, with pull—out of the anchors and
cracking of some of the media support plates. Other
cells also exhibit substantial movement of floor during
backwash. The District intends to implement a compre-
hensive structural investigation to determine the cause
of this failure and to develop a program for
correction. In order for the District to implement such
an investigation and take corrective action, it will
have to removal all of the media to inspect the media
support anchoring system in all 16 cells.
Additionally, the tertiary filter has experienced media
loss over the past several years. The District was in
the process of addressing the media loss problem when
the structural failure problem came into existence. In
order for the District to rebuild the media and bring
the filter up to optimum operational capability, the
structural problem has to be corrected first. Recent
evidence indicates that some media loss may be occurring
due to floor uplift, in addition to media loss over the
weirs. Compliance with provisions of the Act will
certainly impose an arbitrary and unreasonable hardship
since the District cannot provide tertiary level treat-
ment if the filter is out of service. The District is
able to provide good quality secondary effluent without
filtration. Additionally, the filter does not have the
‘structural integrity and physical media capability to
handle high flows in its present condition. Further-
more, the other media support floors may buckle, if kept
in operation, leaving the District with a filter in a
more extensive state of repair.” (Pet. 1—2).
71-453
—4—
As indicated in the aforementioned statements of the
petitioner, the Bloomington and Normal Sanitary District does not
intend to replace and rebuild the media until the serious problem
relating to the media support floors has been investigated and
appropriately repaired. In reference to the propriety of this
method of operation, the Respondent has indicated that “the
Agency agrees with Petitioner that it would be unwise to replace
and rebuild the media prior to investigating and correcting the
media support floor problem.” (Rec. 2). To rectify its media
support floor problems, the Petitioner intends to remove the
media from all sixteen of the tertiary filter cells so that the
media support floor in each cell can be carefully inspected. The
Bloomington and Normal Sanitary District has entered into a con-
tract with, and already retained, the structural consulting firm
of Wyss, Janney and Elstner to analyze and evaluate the
structural capacity of the tertiary filter through detailed
physical inspection of the media support floor and the media
support anchoring system; by thorough physical inspection and
review of all pertinent design criteria; arid by performing the
requisite testing before replacement of the media and placement
of the filter in operation. The structural engineering
consulting firm has been retained to appropriately evaluate the
situation and to present its conclusions and to recommend
engineering solutions to the Petitioner, since the sanitary
district is, at the present time, unsure of the solution to its
problems. (Rec. 2). The Petitioner has estimated that it will
cost approximately $250,000.00 to properly effectuate its filter
restoration. (Pet. 3).
The Petitioner has asserted that it has previously
demonstrated good faith by diligently working to keep the
tertiary filter out of service a minimum time during 1985. The
sanitary district has noted that it enhanced effluent quality by
re—routing the drain—down water piping and removing it from the
filter—bypass line and by making chlorine piping changes at the
filter in 1985 to provide better cleaning capability, while
keeping the filter out of service only three days during these
piping operations. (Pet. 4—5).
In the present situation, the Petitioner has indicated that
“the actual time needed for restoration of the filter can only be
determined when the extent of the structural problem is known arid
the method of correction is defined.” (Pet. 4).
The Petitioner believes that, at the present time, there is
no practical alternative to removing the tertiary filters from
service in order to properly evaluate and correct the media
support floor problem. The Petitioner has stated that:
There are no other alternatives to consider if
the filter is to be put back into full operational
71-454
—5—
capability. The structural integrity of the filter has
to be restored. As the media has to be removed to
inspect the floor and anchor system, the opportunity to
restore the media to the proper depth can also be
achieved at this time. If the District is not allowed
to take the filter out of service, it will only be a
short matter of time before the filter floor collapses
and the District will no longer be able to achieve
compliance with its NPDES permit limits.” (Pet. 4).
The Agency has also indicated that, in view of the need to
remove the tertiary filters from service in order to resolve the
media support floor problem, it “agrees with Petitioner’s assess-
ment of the alternatives”. (Rec. 2)
The sanitary district has stressed that it anticipates no
adverse environmental impact on the receiving stream during the
time period of the requested provisional variance. In its
assessment of the environmental impact, the Petitioner notes
that:
The receiving stream has sufficient flow
available at this time of year (August—October) to
adequately handle effluent of good secondary quality.
Table I contains monitoring information on the
District’s facilities. Table II reflects the downstream
fish monitoring results obtain in 1985. Tables III and
IV reflect the 5 year period from May 1, 1980 to
April 30, 1985 and indicate percent of total flow given
complete treatment (tertiary). The District is able to
disinfect the three secondary effluents. The District
maintains a 14 station water quality monitoring network
throughout its 25 square mile service area, including
5 stations up to four miles downstream of the treatment
plant. Any changes in water quality from 1-4 miles
downstream can be detected. Furthermore, the District
maintains a 20 station biological monitoring network.
The District will be able to document any
changes in
fish number or fish species for a distance of up to
20 miles downstream. It should be noted that under
average flow conditions and within 5 days, the effluent
will have traveled 113 miles distance and will have
reached a point 18 miles in the Illinois River where the
average flow is 17,600 cfs.” (Pet. 3—4).
The Agency agrees with the Petitioner’s environmental
assessment and believes that “the expected environmental impact
will be minimal because disinfected secondary effluent will be
discharged”. (Rec. 2—3). Additionally, the Agency thinks that
any adverse environmental impact will be readily detected, and
treatment operations modified accordingly by the Petitioner as
capabilities allow, because the sanitary district “has
71-455
—6—
established its own water quality and biological monitoring
stations downstream of its discharge”. (Rec. 3).
The Petitioner has claimed that denial of its requested
provisional variance would cause an arbitrary or unreasonable
hardship “since the District cannot provide tertiary level treat-
ment if the filter is out of service” and it would be unfair and
inappropriate to require the Petitioner to meet tertiary effluent
limits while being physically able to provide only secondary
treatment. The Agency agrees with the Petitioner’s contention in
regard to such hardship and has indicated that denial of the
requested relief would place an arbitrary or unreasonable
hardship on the sanitary district because the Petitioner:
(1) “wants to evaluate and correct the problem as quickly as
possible so the tertiary filters can be returned to service”;
(2) “has, and is willing to spend, the money necessary to
evaluate and correct the tertiary filter problems”, and (3) “has
demonstrated via past data that it has the capability to produce
good secondary effluent while the tertiary filters are out of
service”. (Rec. 2).
Accordingly, the Agency has concluded that compliance on a
short—term basis with the provisions of 35 Ill. Adm.
Code 304.120(c) and 304.141(a) would impose an arbitrary or
unreasonable hardship upon the Petitioner. The Agency has stated
that there are no Federal regulations which would preclude the
granting of the requested relief and there are no downstream
public water supplies which would be adversely affected by the
granting of the provisional variance. Therefore, the Agency
recommends that the Board grant the Bloomington and Normal
Sanitary District a provisional variance from Sections 304 .120(c)
and 304.141(a) for a period of 45 days, subject to certain
conditions.
Pursuant to Section 35(b) of the Illinois Environmental
Protection Act, the Board hereby grants the provisional variance
as recommended.
This Opinion constitutes the Board’s findings of fact and
conclusions of law in this matter.
ORD ER
The Petitioner, the Bloomington and Normal Sanitary
District, is hereby granted a provisional variance from 35 Iii.
Adin. Code 304.120(c) and 35 Ill. Adm. Code 304.141(a), subject to
the following conditions:
1. This provisional variance shall begin when the
tertiary filters are first removed from service and
shall continue for 45 days, or until the tertiary
filters are returned to service, whichever occurs
first.
7 1-456
—7—
2. Effluent shall be limited to 25 mg/l weighted
average of the three secondary effluents for both
BOD and TSS as monthly averages. Effluent shall be
sampled by the Petitioner according to NPDES Permit
~IL002773l as to frequency and sample type.
Analysis results shall be submitted to the Agency
on the monthly discharge monitoring report as
30 day averages.
3. The Petitioner shall notify Pat Lindsey of the
Agency’s Compliance Assurance Section via telephone
at 217/782—9720 when the tertiary filters are taken
out of service and when they are returned to
service. Written confirmation of each telephone
notification shall be submitted within 5 days to
the Agency at the address given below:
Illinois Environmental Protection Agency
Division of Water Pollution Control
Compliance Assurance Section
2200 Churchill Road
Springfield, Illinois 62706
Attention: Pat Lindsey
4. The Petitioner shall keep the Agency apprised of
the tertiary filter situation, especially con-
cerning necessary corrective measures and estimated
time frames to implement and complete them.
5. The replacement and rebuilding of the tertiary
filter media shall be included as part of the final
scheme for returning the tertiary filters to
service.
6. The Petitioner shall operate the remainder of the
three treatment facilities so as to produce the
best effluent possible.
7. Within 10 days of the date of the Board’s Order,
the Petitioner shall execute a Certification of
Acceptance and Agreement which shall be sent to
Mr. James Frost of the Agency at the following
address:
Mr. James Frost
Illinois Environmental Protection Agency
Division of Water Pollution Control
2200 Churchill Road
Springfield, Illinois 62706
71-457
—8—
This certification shall have the following form:
I, (We), ________________________________, having read the
Order of the Illinois Pollution Control Board in PCB 86-116 dated
July 31, 1986, understand and accept the said Order, realizing
that such acceptance renders all terms and conditions thereto
binding and enforceable.
Petitioner
By: Authorized Agent
Title
Date
IT IS SO ORDERED.
I, Dorothy M. Gunn, Clerk of the Illinois Pollution Control
Board, hereby certj,fy that the above Opi~ion,.and Order was
adopted on the ~
day of
_____________________,
1986 by a
vote of
_________________.
‘2
/
~7
~
orothy M. Gurn, Clerk’
Illinois Pollution Control Board
71-458