ILLINOIS POLLUTION CONTROL BOARD
October 17, 2002
PIONEER OIL COMPANY,
Petitioner,
v.
ILLINOIS ENVIRONMENTAL
PROTECTION AGENCY,
Respondent.
)
)
)
)
)
)
)
)
)
)
PCB 03-44
(UST Fund)
(90-Day Extension)
ORDER OF THE BOARD (by C.A. Manning):
On October 10, 2002, the parties timely filed a joint notice to extend the 35-day period
within which Pioneer Oil Company (Pioneer) may appeal an August 30, 2002 determination of
the Illinois Environmental Protection Agency (Agency).
See
415 ILCS 5/40(a)(1) (2000)
as
amended by
P.A. 92-0574, eff. June 26, 2002; 35 Ill. Adm. Code 105.406. The Agency did not
approve the site classification work plan budget amendment or completion report regarding a
leaking underground storage tank site at 1st and Poplar in Pana, Christian County. The Board
extends the appeal period until January 6, 2003, as the parties request.
See
415 ILCS 5/40(a)(1)
(2000)
as amended by
P.A. 92-0574, eff. June 26, 2002; 35 Ill. Adm. Code 105.406. If Pioneer
fails to file an appeal on or before that date, the Board will dismiss this case and close the docket.
IT IS SO ORDERED.
I, Dorothy M. Gunn, Clerk of the Illinois Pollution Control Board, certify that the Board
adopted the above order on October 17, 2002, by a vote of 6-0.
Dorothy M. Gunn, Clerk
Illinois Pollution Control Board