1. 74-383

ILLINOIS POLLUTION CONTROL BOARD
January
8, 1987
VILLAGE OF PAWNEE,
)
Petitioner,
)
V.
)
PCB 86—73
ILLINOIS ENVIRONMENTAL
)
PROTECTION AGENCY,
)
)
Respondent.
ORDER OF THE BOARD
(by 3.
Theodore Meyer):
On December 31,
1986 the Village of Pawnee
(Village) filed a
motion for modification
of the Board’s Order
of October
9,
1986
granting the Village variance.
The variance was granted
for the
period March
1,
1987 through July 31,
1987 to allow exceedances
of the BOD5 and TSS effluent limitations
for approximately 19
days while improvements are made
to
a lagoon.
The Village has
subsequently determined that replacement,
rather than repairs, of
certain aspects of its system
is warranted which requires
modifying the work schedule
to accommodate
a completion date of
September
30, 1987,
and allowing discharges at exceedance levels
for
60 rather than
19 days.
Petitioner represents that the
Illinois Environmental Protection Agency does not object
to the
grant of relief as requested
in the motion.
Accordingly, the Village’s motion for modification
is hereby
granted and Attachment A to the Board’s October
9, 1986 Order
is
hereby replaced
by Exhibit A to the Roth Affidavit contained
in
the December
31, 1986 motion.
IT
IS
SO ORDERED.
I,
Dorothy
M.
Gunn, Clerk of the Illinois Pollution Control
Board, hereby cert
y that the above Order was adopted on
the
~?4
day of
_________________,
1987, by a vote of
________
Illino
Control Board
74-383

PLAN OF OPERATION DURING CONSTRUCTION
OF AERATED LAGOON IMPROVEMENTS
REVISED DECEMBER, 1986
ESTIMATED
ESTIMATED
DATE OF ACTIVITY
PLANT
EFFLUENT STENCTH
CONSTRUCTION SEQUENCE
START
COMPLETE
DISCHARGE
BOO
TSS
1.
Pump or siphon cells
2 & 3 to a 6’ water
March 1
May 1
0.827 MCD
30
37
depth (normal depth
is 11’) and pump tansfer
from Cell
ill to Cell
#2
to empty that cell.
2.
Construct a decant pond
to the east of the
May 1
May 31
0.359 MCD
30
37
existing lagoons.
3.
Install a 12” line from the proposed transfer
May 1
May 31
0.359 MCD
30
37
structure between cells 1 and 2,
to the
chlorine structure.
At the same
time,
install new air line on berm between
cells 1 and
2.
4.
Dredge the sludge from
the
lagoons,
June
1
June 15
0
0
0
discharging
to the newly constructed
June 15
June 30
0.359 MCD
pond and decanting back
to
the lagoons.
Dredge cells 2 and 3 before cell
1.
Let
raw sewage accumulate
in cell 1 from
June 1
June 15 and transfer at influent
rate June
15
June 30.
5.
Continue to lower cells
2 and 3, by
June
15
June
30
0.864 MGD
40
50
discharge into
the stream,
allowing raw
sewage pumpage
to accumulate
in Pond No. 1
from June 1
June 15 and transfer from
cell 1 to cell
2 at
influent rate
June15
June 30.

PLAN
OF OPERATION DURING CONSTRUCTION
OF AERATED LAGOON IMPROVEMENTS
REVISED DECEMBER,
1986
ESTIMATED
ESTIMATED
DATE OF ACTIVITY
PLANT
EFFLUENT STENGTH
CONSTRUCTION SEQUENCE
START
COMPLETE
DISCHARGE
BOD
TSS
6.
Install air lines and static tube aerators
July
1
July 30
0
0
0
in cell 2, construct the transfer structure
between cells
2 & 3,
construct the rock
filter in cell 3, place riprap in cell
3,
construct outlet structure
In cell 3 and
install new outlet pipe.
Allow raw sewage
to accumulate
in cell
1.
~
7.
Let water levels in
the
ponds equalize, and
Aug.
1
Aug. 10
0
0
0
check out air system in cell 2 while this
is taking place.
8.
Transfer contents of cell 1 to cell 2 by
Aug.
10
Aug. 25
1.04* MCD
40
50
pumping, and discharge raw sewage to cell
2 by newly installed line.
9.
Install air lines and static tube aerators
Aug.
25
Sept.
25
0.300* MCD
40
50
in cell
1.
10. Test air system
In
cell 1 by transferring
Sept.
25
Sept.
30
0
0
0
part of contents of cell 2 to cell
1.
11. Resume normal operation flowing through
Sept.
30
0.30
0.359
30
37
cells
1,
2 and 3 in series.
MCD
*
Raw sewage pumpage should be less (assumed to be 0.300 MCD) than 0.359 used for earlier part of construction.

CERTIFICATE OF SERVICE
I, Dawn N. Butler,
bereby certify that
I caused a copy of
the Motion for Modification of Pollution Control Board Order
Dated October 9, 1986 to be served upon:
Mr. William Hutton
Illinois Environmental Protection Agency
2200 Churchill Road
Springfield,
Illinois
62706
by mailing
to him a true copy
in an envelope duly addressed
to
him,
bearing
first class postage and depositing
same in the U.S.
Mail in Springfield,
Illinois,
this 30th day of December,
1986e
~
~
74-386