ILLINOIS POLLUTION CONTROL BOARD
June
30, 1988
MARLEY—INGRID (USA),
INC.,
Petitioner,
v.
)
PCB 88—17
ILLINOIS ENVIRONMENTAL
)
PROTECTION AGENCY,
)
Respondent.
ORDER OF THE BOARD
(by B.
Forcade):
On June
21,
1988,
Marley—Ingrid (USA),
Inc.
(“Marley—
Ingrid”) filed
a motion for extension of time within which
to
file briefs,
along with a 60—day waiver of decision (now due
December
16,
1988).
The Illinois Environmental Protection Agency
(“Agency”)
has been notified of Marley—Ingrid’s
intentions and
finds no objections to the extension.
The motion
is granted and
the following briefing schedule is hereby adopted:
Marley—Ingrid
post—hearing brief will be due July
28,
1988;
the Agency’s
response brief due September 15,
1988; and any reply brief
to be
filed by September
23,
1988.
IT IS SO ORDERED
I,
Dorothy M.
Gunn, Clerk
of the Illinois Pollution Control
Board, hereby certify
hat the above Order was adopted on
the
~3ó~day
of _______________________,
1988,
by
a vote
of
7-0
.
Dorothy M.,Znn, Clerk
Illinois P~?llutionControl Board
90—491