ILLINOIS POLLUTION CONTROL BOARD
January 19, 1989
NORTHWESTERN STEEL AND WIRE CO.,
)
Petitioner,
v.
)
PCB 89—11
ILLINOIS ENVIRONMENTAL
)
PROTECTION AGENCY,
)
)
Respondent.
ORDER OF THE
BOARD
(by
J. Theodore Meyer):
This matter comes before the Board upon receipt of
an Agency
Recommendation dated January 19,
1989.
The recommendation refers
to
a request from Petitioner, Northwestern Steel
and Wire Co.
for
a
30 day provisional variance from the 90—day on—site limitations
for hazardous wastes set forth at 35
Ill.
Adm. Code 722.134(b).
Upon receipt of the request
the Agency issued
its
recommendation, concluding that the hazardous wastes must remain
on—site for longer
than 90 days due
to unforeseen,
temporary and
uncontrollable circumstances and failure
to grant the requested
30—day provisional variance would
impose
an arbitrary or
unreasonable hardship on Petitioner.
The Board concurs with the Agency Recommendation; Petitioner
is granted a provisional variance
from 35
Ill. Adm.
Code
722.134(b)
from December
28,
1988
to January 27,
1989.
IT
IS SO ORDERED.
I, Dorothy M.
Gunn, Clerk of the Illinois
Pollution Control
Board, hereby certify that the above
Order was adopted on
the
_______________
day of
~
,
1989 by
a vote
of
_________________.
-
/Q4~4~
~•
~z/Ai~.
Dofothy
M.
9(inn,
Clerk
Illinois Pollution Control
Board
95—359