ILLINOIS POLLUTION CONTROL BOARD
June 2, 1988
BARTLOW BROTHERS, INC. and
CITY OF RUSHVILLE
Petitioners,
v.
)
PCB 88—93
ILLINOIS ENVIRONMENTAL
PROTECTION AGENCY,
Respondent.
OPINION AND ORDER OF THE BOARD (by J.D. Dumelle):
This matter comes before the Board upon a June 1, 1988,
Recommendation of the Illinois Environmental Protection Agency
(Agency). The Agency recommends that Petitioners be granted a
provisional variance for a period of 45 days or until June 30,
1988 to allow the Bartlow Brothers lagoons to be drained for
improvements.
After investigation of Petitioners’ request, the Agency has
concluded that there are no reasonable alternatives to lowering
the lagoons in order to do the necessary work, and recommends
that the provisional variance be granted subject to certain
conditions.
The Board notes an inconsistency in Petitioner’s request.
On page one of the Agency Recommendation 35 Ill. Adm. Code
302.209(b) is referenced; but on page three, 35 Ill. Adm. Code
304.141 is referenced. The Board presumes that 304.141 is the
correct reference.
This Opinion constitutes the Board’s findings of fact and
conclusions or law in this matter.
ORDER
Bartlow Brothers, Inc. and the City of Rushville are hereby
granted a provisional variance from 35 Ill. Adm. Code 304.141
subject to the following conditions:
1. This variance shall commence upon initiation of
bypassing Bartlow Brother, Inc. lagoons and continue
for a period of 45 days or until June 30, 1988,
whichever occurs first.
90—6 7
—2—
2. During the period of this variance, the effluent
discharged from the Bartlow Brother, Inc. lagoons shall
be limited to 60 mg/i SOD and 80 mg/l TSS, monthly
averages.
3. The City shall notify W. Bud Bridgewater of the
Agency’s Springfield Regional Office via telephone at
217/786—6892 when bypassing of the lagoon is begun and
when it is returned to service. Written confirmations
of each notification shall be sent within 5 days to the
following addresses:
Illinois Environmental Protection Agency
4500 South 6th Street
Springfield, Illinois 62706
ATTN: W. Bud Bridgewater
Illinois Environmental Protection Agency
Compliance Assurance Section
2200 Churchill Road
P.O. Box 19276
Springfield, Illinois 62794—9276
ATTN: Mark T. Books
4. Bartlow Brother’s Inc. and the City of Rushville shall
perform laboratory analysis as required in their
respective permits.
5. Within 10 days of the date of the Board’s Order,
Petitioners shall execute a Certificate of Acceptance
and Agreement which shall be sent to Mark T. Books at
the address indicated above.
This variance shall be void if Petitioner fails to
execute and forward the certificate within the ten day
period. The ten day period shall be held in abeyance
during any period that this matter is being appealed.
The form of said Certification shall be as follows:
CERTI FICATION
I, (We), Bartlow Brothers Inc. and the City of Rushville,
having read the Order of the Illinois Pollution Control Board, in
PCB 88—93, dated June 3, 1988, understand and accept the said
Order, realizing that such acceptance renders all terms and
conditions thereto binding and enforceable.
90—68
—3--
Petitioner
By: Authorized Agent
Title
Date
IT IS SO ORDERED.
I, Dorothy M. Gunn, Clerk of the Illinois Pollution Control
Board, hereby certify that the above Opinion and Order was
adopted on the
______________
day of
_____________,
1988 by a vote
of
1-0
1~h.
Dorothy M.~3unn, Clerk
Illinois Pollution Control Board
90—69