ILLINOIS POLLUTION CONTROL BOARD
March
9,
1989
REILLY INDUSTRIES,
INC.
(MADISON COUNTY,
Ll190400006)
Petitioner,
v.
)
PCB 89—46
ILLINOIS ENVIRONMENTAL
PROTECTION AGENCY,
Respondent.
ORDER
OF THE BOARD
(by
3.
Marlin):
This matter
comes before
the Board
upon receipt of an Agency
Recommendation dated March
8,
1989.
The recommendation
refers
to
a request from Petitioner,
Reilly Industries,
Inc. for
a
30 day
provisional
variance from the 90—day on—site limitations
for
hazardous wastes set forth
at
35
Iii. Adm. Code 722.134(b).
Upon receipt of the request
the Agency issued its
recommendation,
concluding
that the hazardous wastes must remain
on—site
for longer
than 90 days due
to unforeseen,
temporary and
uncontrollable circumstances and failure
to grant the requested
30—day provisional variance would
impose an arbitrary or
unreasonable hardship on Petitioner.
The Board
concurs with
the Agency Recommendation; Petitioner
is granted
a provisional variance from 35
Ill.
Adm.
Code
722.134(b)
from March
2,
1989
to April
1,
1989.
IT
IS SO ORDERED.
I,
Dorothy
M. Gunn,
Clerk of
the Illinois Pollution Control
Board,
her(eby certify
that the above Order was adopted on
the
______________
day of
~
,
1989
by a vote
of
Illmo
on Control
Board
97—13 7