ILLINOIS POLLUTION CONTROL BOARD
October
6,
1988
.JOHN DEERE FOUNDRY, EAST MOLINE,
)
Petitioner,
)
v.
)
PCB 88—162
ILLINOIS ENVIRONMENTAL PROTECTION
)
AGENCY,
Respondent.
ORDER OF THE BOARD
(by J.D.
Dumelle):
This matter comes before the Board upon receipt of
an Agency
Recommendation dated October
5,
1988.
The recommendation refers
to
a request from Petitioner, John Deere Foundry,
East Moline,
for a 45—day provisional variance from the water effluent
limits
set
forth at 35 Ill.
Adm.
Code 304.124 and
304.205.
Upon receipt of the request,
the Agency issued
its
recommendation, concluding that
no alternative
to the granting
of
a provisional variance currently exist;
and that denial of the
requested provisional variance would impose an arbitrary and
unreasonable hardship on Petitioner.
However, the recommendation
states that federal categorical
limits preclude granting
of the
requested variance beyond October
30, 1988.
The Board concurs with the Agency recommendation; Petitioner
is granted
a provisional variance subject
to the following
conditions:
a.
The variance shall
commence on
the date of the Board
Order and continue until October
30,
1988.
b.
During the period of
this variance, Total Phenols
discharged from Outfall
003 shall
be
limited to the
following:
Total Phenols
Load Limits
Concentration Limits
8 lbs/daily
maxinum
0.8 mg/l Daily
maxiiium
c.
Petitioner shall continue
to monitor
the effluent from
its treatment plant
for the parameters
as listed
in
NPDES permit #1L0002992.
93—59
—2—
d.
During the period of the variance, Petitioners effluent
limits shall remain the same as NPDES permit #1L0002992
except for Total Phenols
as mentioned
above.
e.
During this provisional
variance Petitioner shall
operated
its wastewater treatment facility so
as
to
produce the best effluent practicable.
f.
Within
10 days of
the date of the Board’s Order,
Petitioner
shall execute
a Certificate of Acceptance and
Agreement which
shall
be sent
to Mark
T. Books at
the
following address.
Illinois Environmental Protection Agency
Division of Water Pollution Control
2200 Churchill Road
P.O. Box 19276
Springfield,
IL 62794—9276
ATTN:
Mark
t.
Books
This variance shall
be void
if Petitioner
fails
to
execute and forward the certificate within the ten day
period.
The ten day period shall
be held
in abeyance
during any period that this matter
is being appealed.
The form of said Certification shall be as follows:
CERTIFICATION
I,
(We), John Deere Foundry, East Moline,
having read the
Order
of the Illinois Pollution Control Board,
in PCB 88—162,
dated October
6, 1988, understand
and accept the said Order,
realizing that such acceptance renders
all terms
and conditions
thereto binding and enforceable.
Petitioner
By:
Authorized Agent
Title
Date
IT IS SO ORDERED.
93—60
—3—
I,
Dorothy M.
Gunn,
Clerk
of the Illinois Pollution Control
Board, hereby certify that the above Order was adopted on
the
_____________
day
of
___________,
1988 by
a vote
°f
~
Dorothy M~/Gunn, Clerk
Illinois~4~ollutionControl Board
93—61