ILLINOIS POLLUTION CONTROL BOARD
    February 23, 1989
    HYDRO—LINE MANUFACTURING CO.
    (Winnebago County, L2010305085)
    )
    Petitioner,
    )
    v.
    )
    PCB 89—39
    ILLINOIS ENVIRONMENTAL
    PROTECTION AGENCY,
    Respondent.
    ORDER OF THE BOARD (by 3. Marlin):
    This matter comes before the Board upon receipt of an Agency
    Recommendation dated February 22, 1989. The recommendation
    refers to a request from Petitioner, Hydro—Line Manufacturing
    Company for a 30 day provisional variance from the 90—day on—site
    limitations for hazardous wastes set forth at 35 Iii. Adm. Code
    722.134(b).
    Upon receipt of the request of the Agency issued its
    reconimendation, concluding that the hazardous wastes must remain
    on—site for longer than 90 days due to unforeseen, temporary and
    uncontrollable circumstances and failure to grant the requested
    30—day provisional variance would impose an arbitrary or
    unreasonable hardship on Petitioner.
    The Board concurs with the Agency Recommendation; Petitioner
    is granted a provisional variance from 35 Iii. Adm. Code
    722.134(b) from January 22, 1989 to February 21, 1989.
    IT IS SO ORDERED.
    I, Dorothy ~4Gunn, Clerk of the Illinois Pollution Control
    Board, hereby certify that the above Order was adopted on the
    ____________
    day of ________________________, 1989, by a vote of
    7~—o
    Dorothy M./)~3unn, Clerk,
    Illinois P’ollution Control Board