ILLINOIS POLLUTION CONTROL BOARD
April
 6,
 1989
GATX TERMINALS CORPORATION,
Petitioner,
v.
 )
 PCB 89—59
ILLINOIS ENVIRONMENTAL
PROTECTION AGENCY,
Respondent.
ORDER OF THE BOARD
 (by B.
 Forcade):
On April
 4,
 1989,
 the GATX Terminals Corporation
 (“GATX”)
filed
 a petition for variance
 from 35
 Iii..
 Adm. Code 201.142 and
201.143.
 That petition
 is deficient
 in that:
It fails
 to indicate whether
 relief can be
granted consistent with federal
 law as
required by 35
 Ill.
 Adrn.
 Code 104.122(a),
specifically, whether
 relief can be granted
 in
light
 of construction bans imposed on Illinois
by USEPA
The Board also notes
 that hearing
 in
 this matter
 is
mandatory and will
 be set
 as soon
 as an amended petition
 is filed
with
 the Board,
 restarting
 the statutory 120—day decision
deadline.
Unless
 an amended petition
 is
 filed within 45 days of
 the
date
 of this Order,
 curing
 the above—noted defect,
 this matter
will
 be
 subject
 to dismissal.
IT
 IS SO ORDERED.
I,
 Dorothy M.
 Gunn, Clerk
 of the Illinois Pollution Control
Board, hereby certify~that the above Order was adopted
 on
the
 ~
 day
 of
 ____________________,
 1989,
 by
 a
 vote
of
 ___________
__
 ___
 ___
 ~
Dor
oLby
 M.
 ~ünn,
 Clerk
Illinois ~11ution
 Control Board
93—93